The Subject Of The Order Is The Modernization Of Asphalt Road Surfaces In The Town Of Miłosław, Commune. Miłosław:- Ul. Kręta-Rybacka (The Length Of The Renovated Section Is 281.50 M) - Ul. Nowa (The Length Of The Renovated Section Is 96.20 M) - Ul. Ogrodowa (The Length Of The Renovated Section Is 160.50 M) - Ul. Skoraczewskiego (The Length Of The Renovated Section Is 204.03 M.) The Scope Includes In Particular: - Ul. Kręta-Rybackathe Intention Includes Renovation Of The Existing Road And Replacement Of Damaged Curbs To The Extent Indicated In The Design Documentation. The Works Will Consist In Corrective Milling Of The Road, Making A Leveling Layer, And Sewage From Concrete Paving Stones. 8 Cm Across The Width Of Two Cubes, On Both Sides Of The Road. A Wearing Course Thick Layer Is Planned To Be Laid Along The Entire Length And Width Of The Road. 4 Cm Made Of Ac 11S Asphalt Concrete. The Investment Also Includes The Regulation Of Street Inlets And Storm And Sanitary Sewage Wells, As Well As Water And Gas Valves. - Ul. The New Project Includes The Renovation Of The Existing Road And The Replacement Of Damaged Curbs To The Extent Indicated In The Design Documentation. The Works Will Consist In Corrective Milling Of The Road, Making A Leveling Layer, And Sewage From Concrete Paving Stones. 8 Cm Across The Width Of Two Cubes, On Both Sides Of The Road. A Wearing Course Thick Layer Is Planned To Be Laid Along The Entire Length And Width Of The Road. 4 Cm Made Of Ac 11S Asphalt Concrete. The Investment Also Includes The Regulation Of Street Inlets And Storm And Sanitary Sewage Wells, As Well As Water And Gas Valves. - Ul. Ogrodowathe Intention Includes The Renovation Of The Existing Road And The Replacement Of Damaged Curbs To The Extent Indicated In The Design Documentation. The Works Will Consist In Corrective Milling Of The Road, Making A Leveling Layer, And Sewage From Concrete Paving Stones. 8 Cm Across The Width Of Two Cubes, On Both Sides Of The Road. A Wearing Course Thick Layer Is Planned To Be Laid Along The Entire Length And Width Of The Road. 4 Cm Made Of Ac 11S Asphalt Concrete. The Investment Also Includes The Regulation Of Street Inlets And Storm And Sanitary Sewage Wells, As Well As Water And Gas Valves. - Ul. Skoraczewskiegothe Plan Includes Renovation Of The Existing Road. The Surface Should Be Adjusted In Height To The Existing Sidewalk Borders From The Inrun Curb, Taking Into Account The Preservation Of The Border Height. The Works Will Consist In Corrective Milling Of The Road, Making A Leveling Layer, And Sewage From Concrete Paving Stones. 8 Cm Across The Width Of Two Cubes, On Both Sides Of The Road. A Wearing Course Thick Layer Is Planned To Be Laid Along The Entire Length And Width Of The Road. 4 Cm Made Of Ac 11S Asphalt Concrete. The Investment Also Includes The Regulation Of Street Inlets And Storm And Sanitary Sewage Wells, As Well As Water And Gas Gate Valves. A Detailed Description Of The Subject Of The Order Is Include
Contact Information
Address
Gmina Miłosław,Miłosław,62-320,Wielkopolskie,Pl414 - Koniński
Contact No.
614382021
Email
sekretariat@miloslaw.info.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110613309
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.