Task No. 1: Location: Jedlina-Zdrój Ul. Sienkiewicza 2, Plot No. 59/4, District 0004 Jedlina-Zdrójthe Subject Of This Order Includes The Execution Of:1. Thermal Modernization Of The Facade - A) Facade - Securing The Joinery, Dismantling Gutters And Downpipes, Removing Plaster Coatings, Cleaning The Facade From Dust And Paints, Strengthening The Substrate, Repairing Defects And Cracks In The Internal And External Walls, Leveling Uneven Wall Surfaces, Making A Base For The Facade Layer, Making A Facade Layer Of Heat-Insulating Plaster, Restoring Facade Details With A Drawn Profile, Painting Twice Façade, The Existing Sandstone Cladding In The Ground Floor Area Should Be Cleaned And Hydrophobized, The Plinth In Damaged Areas Should Be Supplemented With A Natural Sandstone Cladding Including Grouting And Hydrophobization, New Flashings Adapted To The Thickness Of The Insulated Titanium-Zinc Sheet Walls, Installation Of A Protective Net With Anti-Bird Spikes, Removal Of Rubble And Waste. The Colors Of The Facade Should Be Agreed With Wuoz In Wrocław At The Stage Of Execution Of The Works. B) Plinth Zone - Earthworks Within The Underground Walls, Cleaning Of The Walls, Grouting, Waterproofing And Moisture-Proofing Of The Walls Using Bituminous Technology, Securing The Walls With Dimpled Foil, Backfilling The Excavation With Gravel, Laying A Frame Of Concrete Edges On A Cement-Sand Ballast, Execution Gravel Band And In The Ground Floor Zone Around The Perimeter Of The Entire Building, Gravity Injection. C) Access To The Building - Cutting Off Concrete Layers At The Access To The Building And The Threshold, Making A New Concrete Floor And Laying A Surface Layer Of External, Anti-Slip Ceramic Tiles.2. Thermal Insulation Of The Attic - Demolition Of Wooden Attic Floors, Installation Of Thermal And Anti-Sound Insulation With Mineral Wool - One Layer 25 Cm Thick, Construction Of A New Floor From Impregnated Boards. 32 Mm, Laying A New Pvc Lining, Sealing The Plain Roof Tiles And Replacing Titanium-Zinc Sheet Metal Flashings.3. Replacement Of Window Joinery - Replacement Of All Window Joinery With Pvc Windows, Maintaining The Original Architectural Drawing And Dimensions, With A Transmission Coefficient Of Not Less Than 0.9 W/M2k. Windows Must Have Window Vents. Replacing Window Sills.4. Replacement Of External Door Joinery - Replacement Of External Doors On The Front Elevation And Rear Elevation - Door Leaf With Frame. Dimensions, Shape And Structural Division Of Door Joinery Are Subject To Agreement With Wuoz In Wrocław.5. Installation Of 4 Type A Bird Nesting Boxes On The Building Or In Its Surroundings And 1 Bat Box On The Building Or In Its Surroundings, In Accordance With The Guidelines Of The Environmental Expert Opinion. Ii. A Detailed Description And Method Of Execution Of The Order Is Included In The Draft Contract, Architectural And Construction Design Entitled: Thermal Modernization Of A Residential Building 58-330 Jedlina-Zdrój, Ul. Sienkiewicza
|