1602 Sammatintie 7Helsingin Kaupungin Asunnot Oy Requests Offers Regarding The Repair Of The Outer Shell Of The Property. The Contract Is Described In More Detail In The Attachments Of The Request For Tender. The Target Of The Repair Is In Helsinki At The Address Sammatintie 7. The Project Consists Of Two 8- And 3-Story Residential Apartment Buildings. The Buildings Were Designed By Architect Matti Hakur And Completed In 1960-1961. The Site Was Last Extensively Renovated In 2000-2001. There Are A Total Of 205 Apartments In The Buildings. A Building Permit Is Being Applied For The Work, And The Permit Application Has Been Started Before The Publication Of The Call For Tenders. The Site Is Demanding And Its Implementation Requires Special Skills And Experience. The Work Is Carried Out In A Populated Area. Summary Of The Main Measures: House 1, The Main Contents Of The Contract:-Renew The Waterproofing As A Row Joint Sheet Covering-Adding Thermal Insulation To The Upper Floor-Demolition And Renewal Of The Insulation Plastering Of The Facades As Ventilated Sheet Plastering, Mineral Wool As Thermal Insulation-A Test Demolition Is Carried Out To Ensure The Condition Of The Siporex Insulation And Its Attachment To The Load-Bearing Reinforced Concrete Frame-Mechanical Fastening Of The Old Siporex Blocks 4 Pcs / M2, M10 Threaded Rod, Ø100 Mm Washer T=2.0 Mm + Nut, All Rst. Chemical Anchoring, E.G. Hilti Hit-Hy 200-A V3.-Renovation And Coating Of Plinths-Removal, Cleaning, Maintenance Painting And Re-Installation Of Steni Color Boards-Maintenance Renovation Of Apartment Balconies-Maintenance Renovation Of Windows-Renew Ventilation Balconies As Concrete Structures-Converting Smoke Extraction To Electric House 2 Contents Of The Contract Mainly:-Water Roof Renovation And Maintenance Painting-Thermal Insulation Addition To The Top Floor-Renovation Of Facades And Maintenance Painting-Renovation Of Plinths And Painting-Renew The Insulating Plastering Of The West End As Ventilated Sheet Plastering-Maintenance Renovation Of Apartment Balconies-Maintenance Renovation Of Windows-Conversion Of Smoke Extraction To Electric The Content Of The Waste Shed Project Mainly:-Washing Of Exterior Surfaces-Maintenance Painting Of Wooden Parts-Maintenance Painting Of The Ridged Seam Roof Yards And Areas, Content Of The Project Mainly:-Updating Outdoor Lighting To Old Installation Locations-Renovation Of 2 Yard Stairs-Renewal Of Outdoor Equipment And Furniture-Vegetation Maintenance Operations-Improvement Of Stormwater Control Locally-Repair Of Individual Septic Tank-Worksite Arrangements And Protection, Cleaning, Scaffolding, Waste Sorting, Resident Information And Work Safety- Other Measures Recorded In Documents Work On The Site Must Start As Soon As Possible After Signing The Contract, At The Latest 08/2026. The Work Itself Must Be Carried Out Continuously From The Start. The Purpose Would Be To Have Approx. 50% Of The Work Done In 2026 And The Remaining 50% In 2027. The Contractor Will Draw Up A Work Schedule And External Work Must Be Completed By 6/2027. The Contract Must Be Completed, Deficiencies Corrected And Handed Over No Later Than August 31, 2027. The Tenderer Must Give The Total Contract Price (Vat 0%) In Accordance With The Tender Request And Its Appendices. The Tenderer Who Submitted The Most Economically Advantageous Tender Will Be Selected As The Contractor.
Contact Information
Address
Viipurinkatu 2
Email
heka.hankinnat@hekaoy.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110606697
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.