Request For Quotationsdescription Of Scope Of Workthe Scope Of Work Covered Under This Project Consists Of The Furnishing Of All Superintendence, Overhead, Skilled Labour, Materials, Tools, Equipment, Insurance, Fuel, Transportation And All Things Necessary For And Incidental To The Satisfactory Performance And Completion Of Flood Box Installs, Located At Flood Box Locations As Specified In Appendix 2-A, Surrey, British Columbia (The “Place Of Work’) In Strict Accordance With The Specifications And Accompanying Drawings And Subject To All Terms And Conditions Of The Contract.The Work Consists Of But Is Not Necessarily Limited To The Following:Remove And Dispose Of The Existing Flood Boxesinstallation Of New Culvertsinstallation Of Backfill Of The New Pipes Through The Dikesthe Area Of Work To Be Performed Shall Be At The Locations Shown In The Attached Contract Drawings.The Contractor Is Advised To Review The Supplementary Specifications In Detail As There Are Requirements For The Various Items Of Work.The Detailed Scope Of Work Is As Described On The Contract Drawings (Listed Below), Special Provisions (Schedule B–Appendix 1), And Method Of Measurement And Payment (Schedule B- Appendix 2) And Supplementary Specifications (Schedule B- Appendix 3). The Contractor Is Advised To Review The Supplementary Specifications In Detail As There Are Requirements For The Various Items Of Work.The Lack Of And/Or Omission Of Detailed Specifications Does Not Minimize The Acceptable Levels Of Service And Only The Best Commercial Practices Are Acceptable.The City Reserves The Right To Add, Delete Or Change Areas Of The Work, And May Do So Upon Giving Written Notification To The Contractor. If These Changes Cause An Increase Or A Reduction In The Costs, Said Costs Will Be Adjusted And, When Agreed Upon, Incorporated Into The Agreement. Any Adjusted Costs Shall Conform To Rates As Set Out In Schedule C Quotation. The Contractor Shall Not Perform Any Extra Work Without The Prior Approval Of The City.Contractor To Comply With All Bc Plumbing Code, Bc Fire Marshal, Bc Workers’ Compensation Board, National Building Code Of Canada, Bc Boiler Inspector, Bc Electrical Inspector, National Fire Protection Association, And Any Other Authorities Having Local Jurisdiction. Failure To Abide By These Rules And Regulations Will Result In Being Immediately Escorted From The Work Site.Addendaif The City Determines That An Amendment Is Required To This Rfq, The City Representative Will Issue A Written Addendum By Posting It On The Bc Bid Website At Www.Bcbid.Gov.Bc.Ca And The City Website At Www.Surrey.Ca (Collectively, The “Websites”), And Upon Posting, Any Addenda Will Form A Part Of This Rfq. It Is The Responsibility Of Contractors To Check The Websites For Addenda. The Only Way This Rfq May Be Added To, Or Amended In Any Way, Is By A Formal Written Addendum. No Other Communication, Whether Written Or Oral, From Any Person Will Affect Or Modify The Terms Of This Rfq Or May Be Relied Upon By Any Contractor. By Delivery Of A Quotation The Contractor Is Deemed To Have Received, Accepted And Understood The Entire Rfq, Including Any And All Addenda.All Inquiries Related To This Rfq Should Be Directed In Writing Topurchasing@Surrey.Ca
|