|
Rental Of Warehouse Type Container - Minimum Area Of 13.80 M², Floor Protection With Burlap And Plaster Fabric, Assembly And Disassembly Of Metallic Tower Scaffolding With A Height Of Up To 10 M, Metallic Tower Scaffolding (1.5 10:05:59, 03/17/2026 - 10:06:01, 03/17/2026 - 10:06:02, 03/17/2026 - 10:06:03, Manual Demolition Of Reinforced Concrete, Mechanized Demolition Of Concrete Pavement Or Floor, Including Fragmentation And Accommodation Of The Material, Manual Demolition Of Skirting, Sill Or Sill, Made Of Ceramic Material And/Or Hydraulic Tile, Including The Base, Manual Demolition Of Ceramic Coating, Manual Racking Of Floor, Wall Or Ceiling, Manual Demolition Of Lifting Masonry Or Hollow Element, Including Coating, Manual Demolition Of Any Ceiling, Including Fixing System / Billet, Manual Demolition Of Panels Partitions, Including Metal Mounts, Removal Of Paint On Skirting, Baguette Or Frame With Sandpaper, Removal Of Paint On Wooden And/Or Metallic Surfaces With Chemical Products, Removal Of Mass Paint With Sanding, Mechanized Dismantling (Lifting) Of Cobblestone Pavement Or Concrete Tile, Including Loading, Transport Up To 1 Kilometer And Unloading, Mechanized Demolition Of Gutter Or Gutter, Including Fragmentation, Loading, Removal Of Fence, Removal Of Wooden Structure Scissors - Any Profile Tiles, Removal Of Clay Roofing, Removal Of Profile Roofing And Any Material, Except Clay, Removal Of Stone, Granite Or Marble Skirting, Removal Of Flooring In Synthetic Material Layed To Glue, Removal Of Stops With Wooden Trim And Linear Parts, Leads, Removal Of Wooden Elements And Fixing System Type Frames, Blackboards, Etc., Removal Of Wooden Or Metal Cabinets, Removal Of Metal Frames In General, Removal Of Stops, Handrails Or Metallic Linear Parts, Removal Of Railings Or Railings In General, Removal Of Locks Or Built-In Closure, Removal Of Hinge, Removal Of Sanitary Appliances Including Accessories, Removal Of Built-In Registers Or Valve, Removal Of Faucet Or Shower, Removal Of Siphons Or Miscellaneous Sanitary Metals, Removal Of Glass Frames, Removal Of Lighting Devices Or Projectors Fixed To The Ceiling, Floor Or Wall, Removal Of Condulet, Removal Of Thermomagnetic Circuit Breaker, Removal Of Switches, Sockets, Bell Button Or Buzzer, Removal Of Lamp, Removal Of Concrete Post, Removal Of Distribution Board, Call Or Pass Box, Removal Of Ballast For Lamp, Removal Of Apparent Electrical Piping With An External Diameter Of Up To 50 Mm, Removal Of Piping Built-In Electrical With External Diameter Above 50 Mm, Removal Of Gutters Or Flashings, Removal Of Hydraulic Piping In General, Including Connections, Boxes And Drains, Removal Of Fibercement Tanks Up To 1000 Liters, Manual Removal Of Cobblestones Or Concrete Slabs, Including Cleaning And Stacking, Manual Removal Of Guides Pre-Molded, Manual Cleaning Of The Land, Including Logs Up To 5 Cm In Diameter, With A Truck Available Inside The Site, Up To A Radius Of 1 Km, Mechanized Cleaning Of The Land, Including Logs Up To 15 Cm In Diameter, With A Truck Available Inside And Outside The Site, With Transport Within A Radius Of Up To 1 Km, Removal Of Separate Debris Construction Site With Metal Bucket - Earth, Masonry, Concrete, Mortar, Wood, Paper, Plastic Or Metal, Rubble Removal
|