Structural Shell Work – Shell Work (Sh-122Vs520 - Plön, Mus, Neub Ugeb 47 And 54). The Construction Of Two New Accommodation Buildings Is Planned On The Site Of The Naval Nco School In Plön, Building 47 And Building 54. These Will Be Built On Two Separate, Unconnected Construction Sites On The Property. Access Is Via The Main Gate Of The Barracks. The Areas Are Accessible From A Traffic Point Of View Via The Paved Road Areas Within The Site. The New Accommodation Building 47 Is To Be Built On A Former Forest Area On The Southeastern Border Of The Site. As Part Of The Construction Project, The Property Will Be Connected To The Propertys Existing Infrastructure. The Construction Area Covers Approx. 5,860M². The New Accommodation Building 54 Is Planned On The Area Between Buildings 53 And The Rüh (Rescue Training Hall). The Property Is Connected To The Existing Infrastructure Of The Property. The Construction Area Covers Approx. 2,400M². The Four-Story Buildings With A Total Dimension Of 57.70 M X 14.16 M Have A 43° Inclined Gable Roof And Are Accessed Via Two Stairwells On The Long Side. The Eaves Height Is 10.50 M, The Ridge Height Is 17.10 M. These Are Solid Buildings With Masonry Walls, Reinforced Concrete Ceilings And A Wooden Roof Structure. Each New Building Contains 81 Individual Accommodations. For The Duration Of The Bvh In The Period Approx. Iii. Q 2026 To Approx. Iv. Q 2028, A Higher-Level Construction Site Facility And Its Provision On Construction Site 47 Are Planned To Be Recorded In A Separate List Of Services. The Connection To The Property Is Recorded In A Separate List Of Services And Will Be Completed By The Start Of The Measure. Type And Scope Of The Measure: Construction Site Clearance Approx. 2,500 Sqm, Topsoil Work, Demolition Of Transformer Building, Construction Site Traffic Area 500 Sqm, Crane Stand Area, Dewatering, Building Protection, Tower Crane 2X (Preliminary Remarks), Earthworks: Construction Pits Approx. 2,450 Cbm, Excavation, Creating Subgrade, Disposal Of Soil Pipe Trenches Approx. 2,000 Cbm, Refilling Underground Pipes: Wastewater Approx. 700M, Shafts, Drinking Water Approx. 120M, Hydrants, Introduction Of Elt, District Heating, Telecommunications, Tw Concrete Work: Floor Slabs Approx. 1,600Sqm, Foundation Work, Perimeter Insulation, Sealing Work, Element Ceilings Approx. 4,600Sqm, Breakthroughs, Core Drilling, Prefabricated Lintels, Concrete Lining Approx. 180Sqm, Ring Beams Approx. 420M, Prefabricated Staircases 24 Pieces, Stair Landings, Masonry Work: Ks External Walls Approx. 2,400 Sqm, Ks Internal Walls Approx. 3,900 Sqm, Openings, Lintels, Bushings, The Safety Requirements For Military Installations Apply.
|