|
The Work Of Services Maintenance Of Mechanical- Electrical Equipments And Systems As When Required Basis For Central Air Condition Plants Of Adm, Ecb, Swas Chiller Plant, Co2 Refrigeration System Of Gt-Ccpp-Ii Package A/C(Switch Yard C/R-Ccpp-I) At Gsecl, Utran.-A A/C Plant Of Electricals & Control Building (Ecb):- 1 A1. Routine/ Preventive Maintenance Of Central A/C Plant Of Ecb (1 Job =02 Nos. Central A/C Plant Unit I.E. 02 Nos. Main Unit, 02 Nos. Chiller, 02 Nos. Condenser, 02 Nos. Ahu & 02 Nos. Cooling Tower Etc.) 8 Job 2 A2. Overhauling Of Ac Compressors 4 No. 3 A3.Condenser Cleaning And Testing 8 No. 4 A4. Chiller Cleaning And Testing 4 No. 5 A5. Suction Filter, Oil Filter, Liquid Line Filter And Outside Cleaning Of Ac Compressor. 8 No. 6 A6. Leakage Checking, Attending And Gas Filling Of Ac Compressor System. 8 No. 7 A7. Oil Replacement Work Of Ac Compressor 4 No. 8 A8. Complete Ahu System Overhauling Of Ecb 6 No. 9 A9. Cleaning, De-Scaling, Preventive-Routine Maintenance Cooling Tower 4 No. 10 A10. Removal, Unloading, Loading And Refitting Ac Compressor -Motor Of Ecb. 4 No. 11 A11. As & When Required / Emergency On Call Basis For Above Work 12 Call B A/C Plant Of Administrative Building::- 1 B1. Routine Maintenance Of Central A/C Plant Of Unit Of Adm 1 Job =02 Nos. Central A/C Plant Unit I.E. 02 Nos. Main Unit, 02 Nos. Chiller, 02 Nos. Condenser, 02 Nos. Ahu & 02 Nos. Cooling Tower Etc.) 8 Job 2 B2. Overhauling Of Ac Compressors 4 No. 3 B3. Condenser Cleaning And Testing 8 No. Page 52 Of 54 4 B4. Chiller Cleaning And Testing 4 No. 5 B5. Suction Filter, Oil Filter, Liquid Line Filter And Outside Cleaning Of Ac Compressor. 8 No. 6 B6. Leakage Checking, Attending And Gas Filling Of Ac Compressor System. 8 No. 7 B7. Oil Replacement Work Of Ac Compressor 4 No. 8 B8. Complete Ahu System Overhauling Of Adm 6 No. 9 B9. Cleaning, De-Scaling, Preventive-Routine Maintenance Cooling Tower 4 No. 10 B10. Removal, Unloading, Loading And Refitting Ac Compressor -Motor Of Adm. 4 No. 11 B11. As & When Required/ Emergency On Call Basis For Above Work 12 Call C Swas Chiller Unit:- 1 C1. Routine Maintenance Of Swas Chiller Plant Of Unit 8 Job 2 C2. Overhauling Of Swas Ac Compressors 4 No. 3 C3. Leakage Checking, Attending And Gas Filling Of Ac Compressor System. 8 No. 4 C4. As & When Required/ Emergency On Call Basis For Above Work. Swas Unit 8 Call D Refrigeration System Of Co2 Tanks For Gt Fire System 1 D1. Servicing & Overhauling Of Co2 Refrigeration System, 2 Nos/Unit Per Job 6 Job 2 D2. Leakage Checking, Attending And Gas Filling Of Co2 Refrigeration System 6 No. 3 D3. Removal, Unloading, Loading & Refitting Of A.C. Compressor Of Co2 System 6 No. 4 D4. As & When Required/ Emergency On Call Basis For Above Work(Co2 System) 8 Call E Blue Star Make Package A.C. System Of Switchyard Control Room At Ccpp-I 1 E1. Servicing & Overhauling Of Package A.C.Of Blue Star Refrigeration System, 2 No.S/Unit/Job 8 Job 2 E2. Leakage Checking, Attending And Gas Filling Of Package A. C. Refrigeration System 6 No. 3 E3. Removal, Unloading, Loading & Refitting Of A. C. Compressor Of Package. A. C. System 6 No. Page 53 Of 54 4 E4. As & When Required/ Emergency On Call Basis For Above Work(Blue Star System) 8 Call F Electrical Work Of A Compressor Rewinding Of Screw Chiller At Ccpp-Ii. 1 F1. Rewinding Of Compressor Motor Of Refcomp, Make 3 Phase 90 Kw. 1450 Rpm With Transpotation 2 No. 2 F2. Replacement Of Terminal Kit, Studs, Bakelite Plate Of 3 Phase, 50Hz, 90 Kw. 1450 Rpm Stator. 2 No. 3 F3. Rewinding Of Compressor Motor Of Refcomp, Make 3 Phase 115 Kw. 2900 Rpm With Transpotation 2 No. 4 F4. Replacement Of Terminal Kit, Studs, Bakelite Plate Of 3 Phase, 50Hz, 115 Kw. 2900 - Rpm With All Miscellaneous Items. 2 No. 5 F5. Complete Rewinding Of Stator With New Copper Wire , F Class Insulation And Overhauling Of 415 V 3 Phase 50 C/S, For 0.18 Kw To 0.75 Kw 1340/1400/700/20M-Min/1365 / 2810 / 1392 / 910 / 680 / 1370 /2800/1400 /2800/2815/900/1310/1400/550/2840/1410 /1340/ 240/1405/985/1440/ 1885 Rpm Squirral Cage Induction Motor For Chiiler Pump In Swas System And Condenser Fan Motor In Liquid Co2 Fire Protection System And 135 Mw Ccpp-I Air Cooling System. 20 No. 6 F6. Complete Rewinding Of Stator With New Copper Wire, F Class Insulation And Overhauling Of 415V 3 Phase 50 C/S, For 1.00 Kw To 1.20Kw, 1410/1385/950/ 1400/ 195/90/2700/700/800 Rpm Squirrel Cage Induction Motor For Booster Pump In Swas System. 2 No. 7 F7. Metalizing And Machining For Preparation Of Motor Shaft Diameter As Per Requirement. 100 Squ Are Cm 8 F8. Metalizing And Machining For Preparation Of Motor Bearing Housing As Per Requirement. 100 Squ Are Cm
|