The City Of Rauma Is Asking For Your Offer For The Renewal Of The Kuuskajaskari Island Jetty And The Modification Work Regarding The Syväraumanlahti Water Bus Jetty. Kuuskajaskari - Renewal Of The Wooden Parts Of The Concrete Coffin Jetty - Renewal Of The Concrete Pontoon Jetties About 60 M New Pontoon Jetties 3 Pcs X 20 M The Covers Of The Concrete Pontoons Will Be Left With A Concrete Surface. The Surfaces Must Be Of Uniform Quality And Rough (Plastic Fiber K-40 Waterproof)O Safety Ladder 4 Pcs 4,000 Kg Concrete Anchors 18 Pcs G40 Strength-Rated Chains 20 Mm, 30 M + Shackles 20 Mm Strength Rating Kzno Rescue Equipment Set Installation Pipe For Electrical Furniture And Provision For Water Pipes (In The Middle Of The Platform)O Crash Bars For Ends And Sides 140 X 140 Mmo Cross Bollards 26 Units Electrical Distribution Center Equipped With Led Lighting 6X16a Cee 3 Pcs- Gangway Between Coffin And Pontoon Piers 6 M X 1.2 M + Ground Support For The Gangway- Modification Of The Structures Under The Gangway Of The Existing Small Boat Pier: Renewal Of The Structures Below The Gangway Of The Small Boat Pier (Barrels) And Lifting Of The End For The End On The Mainland Side- Dismantling Of 3 Bollards Of The Coffin Pier- New Aluminum Ramp Of The Coffin Pier For The Water Bus Pier Including Handrails, A Reversible Flap And Wheels For Movement Syväraumanlahti- Extending The Existing Ramp And Handrail On The Beach Side - Raising The Pier Deck- New Handrails For The Raised Part + Hinged Flap At The End Of The Footbridge On The Side Of The Pier- New Ramp For The Pier + Handrails- Narrowing Of The Stairs And Again Positioning From The Offers, The Cheapest Offer That Meets The Minimum Requirements Of The Tender Request Will Be Selected. The Installation Will Be Carried Out As Soon As The Ice Conditions Allow It. The Renewal Of The Wooden Parts Of The Concrete Coffin Must Be Completed In May 2026. The Overall Schedule Will Be Negotiated Separately. Implementation, However, During 2026. The Condition For Implementation Is The Granting Of Any Permits. The Old Piers Will Be Moved To The Mainland To A Location To Be Announced Later (Raumalla). Waste Management/Recycling Costs Belong To The Customer. The Transfer Of The Existing Dock Weights To The Mainland To A Location To Be Announced Later (In Rauma) Is Included In The Contract. Recycling Costs Belong To The Customer.
Contact Information
Address
Kanalinranta 3
Contact No.
+358283411
Email
hankintatoimi@rauma.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110537049
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.