|
Tender for Tender For Supply, Installation, Commissioning And Maintenance Of Cctv Systems For Igr 3.0 Project Under Lease Cum Service Model For A Period Of 5 Years , Annexure - 13 Price Bid , Cctv Camera 2 Mp With 512 Gb Sd Card With Voice Recording , 8 Ch Nvr , 20 Tb (10*2) Hard Disk , 8 Port Gigabit Layer 2 Poe Switch , Cat 6 Network Cable (For Connecting Three Ip Cameras, Nvr And Desktop Computer) (Unit Cost In Mtr To Be Quoted) , Desktop Computer For Sro Office , Monitor 27 For special repair View With 15 Mtrs Hdmi Cable , 1 Kva Ups With 120 Min Backup With Mcb , Earthing Systems In All Sro , Labor Charges For Lan Cabling And Related Services Including Ip Configuration. 1 Pvc Pipe With Fixtures (Cat 6) , Ups Output Wiring From 1 Kva On-Line Ups To Desktop And 6U Rack (3C*2.5Sq.Mm) , Labor Charges For Ups Wiring And Related Services, 1 Pvc Pipe With Fixtures , 2* 5 A Switch And Socket , 1 *15 A Ss Combined , Active Led Videowall With Controller , Display Monitor 55 Inch , 24 Port L3 Ethernet Switch With 4 Sfp+ Port , Workstation For Dig & Ig Office For Vms Client & Workstation For Time And Attendance Database And Application Hosting , 42 U Server Rack Customisable - Ig Office , 24 U Server Rack - Dig Office To Place Ai Servers , Centrally Managed Cloud Platform Required For Whatsapp Integration - Secured Storage, Video Dissemination. Cost For Software Support, Enhancement , Time And Attendance Management Software As Per Technical Requirements , Finger Print Scanner With Software Kit , Server For The Video Management Software- Igr Ho (Management) , Server For The Video Management Software- Igr Ho (Streaming) , Server For Ai Functions (11 + 1) , Vms Licenses For 3000 Cameras With Client Login , Ai Functions Vms Licenses For 600 Cameras - special repair Camera1 , Alternate Gateway For Tnega Whatsapp Gateway , Manpower-1 Ipc Operator/Deo- Year1 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower-1 Ipc Operator/Deo- Year2 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower-1 Ipc Operator/Deo- Year3 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower-1 Ipc Operator/Deo- Year4 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower-1 Ipc Operator/Deo- Year5 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 2- Team Leader -Year1(Unit Cost Per Resource Per Year To Be Quoted) , Manpower 2- Team Leader -Year2 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 2- Team Leader -Year3 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 2- Team Leader -Year4 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 2- Team Leader -Year5 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 3- L2 Engineer -Year1 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 3- L2 Engineer -Year2 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 3- L2 Engineer -Year3 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 3- L2 Engineer -Year4 (Unit Cost Per Resource Per Year To Be Quoted) , Manpower 3- L2 Engineer -Year5 (Unit Cost Per Resource Per Year To Be Quoted) , Setting Up Necessary Infrastructure In Igr Office For Running All Server Services Such As Ups, Genset, Ac, Rack, Network Cables, San Switch, Router, Static Ips, Fire Wall, Plug Points, Installation Of Ports And Other Required Accessories - Qty - As Required To Meet The Sla , Aggregation Bandwidth With Back Up Connectivity For 5 Years , Comprehensive annual maintenance contract Of Existing 1150 Ip Camera In Record Room (S) Of Sro (Unit Cost For 5 Years Per Camera To Be Quoted) , Integration Of 1150 With New System , Shifting Cost For Ip Camera And Other Related Infrastructure From Sro Office To Another. , Cost For Ip Camera Installation Setup In New Office - For New Office 5 No Ip Camera, 2 No Nvr, 2 No 8 Poe Port Switch, 20 Tb Hdd, Computer, Monitor, Ups Installations Commissions As Per Technical Specifications Each Items In Above
|