|
Construction Of A Stage And A Roof Over The Dance Floor In The Town Of Zamojska, Including The Following Construction Works: - Earthworks, Foundations, - Excavation For Foundation Footings And Pegs For The Stage Structures, - Concrete Sleepers On The Ground - Lean C8/10 Concrete. 10 Cm Under The Feet, - Reinforced Concrete Foundation Footings In System Formwork - C20/25 Concrete, - Base For Wooden Poles And Pegs For Stage Structures - C20/25 Concrete, - Anchors For Wooden Poles, - Reinforcement Of Reinforced Concrete Structures, - Bituminous Coating Moisture Insulation, - Backfilling Of Foundations, - Removal Of Excess Soil After Backfilling The Foundations, - Wooden Structure Of Walls And Roof, - Columns 16 X 16 Cm, - Rafters 8 X 20 Cm, - Purlins 16 X 22 Cm, - Corner Rafters 10 X 20 Cm, - Braces 5 X 16 Cm, - Roof Covering, - Counter Battens, - Roof Membrane, - Patching Of Roof Slopes With Saturated Timber, - Roof Covering With Coated Roof Tile Sheets, - Assembly Ridge Tiles, - Flashings Made Of Coated Sheet Metal, - Roof Gutters Made Of Coated Sheet Metal, - Downpipes Made Of Coated Sheet Metal, - Overhang Made Of Façade Boards, Thickness 1.80 Cm, - Stage Platform, - Wooden Structure For The Stage Floor, - Floor Made Of Planed Boards 32 Mm Thick, - Wooden Stairs 1.38 M Wide, - Sheathing Of The Frame Walls - Casing Of The Stage Platform With Facade Boards Thick. 32 Mm, - Impregnation Of Wooden Elements With Wood Impregnation, - Dance Slab, - Priming The Surface For Applying A Protective Resin Layer, - Epoxy Protective Coating - Protection Of The Reinforced Concrete Dance Slab With Resin, - External Electrical Installation 5/10 M, - Digging Trenches For Cables, Manually, Category Iii Soil, - Pouring A Layer Of Sand At The Bottom Of The Cable Trench, Width Up To 0.4 M, - Laying Pvc Protective Pipes Up To Fi 140 Mm - Dvk 75, - Backfilling Cable Trenches, Manually, Soil Category Iii - Laying Cables In Cable Trenches - Manually, Cable 1.0 Kg/M, Covered With Foil, - Laying Cables In Pipes, Hollow Bricks Or Closed Channels, Cable Up To 1.0 Kg/M - Approach To Wg And Zl-1 Connectors, - Distribution Devices (Sets) On Foundations, Weight Up To 20 Kg, On Prefabricated Foundations - Zl-1 - Dry Processing Of Cables Up To 1 Kv With Plastic Insulation And Sheath, 4-Core Al Cable Up To 50 Mm2, - Internal Power Lines + Switchboards, - Winidur Pipes Laid On Low, Non-Concrete Substrate, Fi 47 Mm, - Cables Pulled Into Pipes And Closed Channels, Channels, Cross-Section Up To 50 Mm2, - Switchboards And Housings, Board Up To 10 Kg Rn3x12-55, - Installation Of A Gwp Circuit Breaker, - Modular Equipment In Switchboards, Overcurrent Switch, 1 Pole, - Modular Equipment In Switchboards, 3 Pole, - Electrical Devices, Weight Up To 2.5 Kg - Surge Arresters, - Additional Equipment For Modular Switchboards, Rail 3-Pole Switchgear, - Additional Equipment For Modular Switchboards, Connection Strip (Terminal Strip), - Connecting Wires To Terminals Or Pins, Single Wire Up To 16 Mm2,
|