|
1. The Subject Of The Order Is Reconstruction Of Municipal Road No. 191356C In The Town Of Trzeszczon Over A Length Of 1,449 M.2. The Investment Will Be Carried Out Along The Existing Municipal Road, Within The Plots: Plot No. 20, 159, 162, District No. 0020 Trzeszczondz. No. 135, Precinct No. 0019 Szczecindz. No. 213, 171 And 170, Precinct No. 0024 Zbijewo.3. The Investment Is Co-Financed By The Government Road Development Fund.4. Detailed Description Of The Subject Of The Order: The Investment Will Be Carried Out Along The Existing Municipal Road In Trzeszczon From Km 0+000 To Km 1+449, Section Length. 1449 M, Width 3.5 M. One Road Was Designed With One Lane, Intended For Traffic In Both Directions, Cross-Section 1X1, 3.5 M Wide. Road Parameters: - Road Width 3.5 M, - Width Of Paved Shoulders 0.75 M With A Slope Of 6%, - Surface Structure With Kr1, - Class L Municipal Road, - Roof Slope Of The Road 2%. Roadway: Wearing Course Thickness. 3Cm Ba Ac8s50/70, - Binding Layer Thick. 4Cm Of Ba Ac11w50/70, - Upper Foundation Layer Thick. 8Cm With Ears 0/31.5Mm, Lower Foundation Layer Thick. 12 Cm With Ears 0/31.5 Mm, - Cutting Layer Of Sand, Thickness 10 Cm, Profiled And Compacted Ground Base. Shoulders: 0.75 M Wide Double-Sided Shoulders Made Of Mechanically Stabilized Crushed Aggregate 0/31.5 Mm Thick, 10 Cm Thick, Profiled And Compacted Ground Base. Drainage: Drainage Of The Designed Surface Is Carried Out On The Surface Through Designed Transverse Slopes By Bringing Water To The Areas Adjacent.5. A Detailed Description Of The Subject Of The Order Is Included In The Construction Design Constituting Annex No. 6 To The Swz, Traffic Organization Constituting Annex No. 8 To The Swz, In The Bill Of Quantities Constituting Annex No. 5 To The Swz And In The Detailed Technical Specification Constituting Annex No. 7 To The Swz.6. The Contractor, Without Additional Remuneration, Undertakes To: 1) Perform All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Supply The Necessary Utilities For The Implementation Of The Subject Of The Contract, Including: Electricity, Water, Etc. And Bear The Costs Of Their Consumption, Based On The Re-Invoice Issued By The Ordering Party For The Utilities Actually Used, 2) Marking The Construction Site, Including: Placing An Information Board Resulting From The Construction Law, And 2 Pieces Of Information Boards On Project Co-Financing (1 Piece During The Commencement Of Work And 1 Piece After Completion Of The Work) Containing Content In Accordance With The Guidelines Constituting Annex No. 9 To The Swz,3) Bearing All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And Proper Execution Of The Subject Of The Order,4) Bearing The Costs Related To The Acceptance Of The Completed Works,5) Bearing The Costs Of Exporting Excess Soil To The Place Designated By The Ordering Party,6) In The Event Of Damage To Equipment Or Parts Thereof
|