Sun-Protection Works – Friedrichshafen Vocational School Center, Renovation Of Shed Roofs And Facade - Internal Darkening. - Description Of Measures The Friedrichshafen District Office Is Planning To Carry Out Energy-Efficient Renovation Of The Existing Facades And Pitched Roofs While Operations Continue. The Measure Is Divided Into Several Construction Phases. The Shed Roof Renovation Of The Southern Half Of The Building Began In 2025. Completion Of The Northern Half Is Scheduled For February 2027. - Subject Of This Tender The Subject Of This Tender Is Essentially The Manufacture, Delivery And Installation Of Sun Protection Systems Inside The Building, On The Shed Roof Glazing Side Of The Room. - General Information Shed Roof Renovation A Total Of 14 Identical Shed Roof Constructions Are Planned For Renovation Over The Existing Workshops With A: Total Width Of Approx. 2.70M A Height Of Approx. 1.50M Individual Length Of Approx Sun Protection Systems On The Room Side Of The Light Roof Glazing. They Are Screwed Together With A Textile Covering Between The Existing Steel Rr Pipes Of The Substructure. The Square Panel With An Inspection That Can Be Opened Downwards Is Located In An On-Site Shaft Formation Of The Light Strip. The Guide Rails Are Attached By Screwing Them Laterally Into The Existing Rr Tube Construction. The Box Can Also Be Fastened Upwards In The Lintel Area To A Sheet Steel Edged Part. The Curtain Width In The Standard Field (Axis Grid 2.40M) Is Approx. 2,340Mm. In The Different Field On The Rising Gable Walls, The Curtain Width Is Approx. 2,200Mm. The Work In The Ridge Area Of The Shed Roofs Sometimes Takes Place In A Cramped Working Space (See Image Documentation). Work In A Confined Work Space Must Be Taken Into Account. Necessary Aids Such As Scaffolding, Mobile Scaffolding Or Lifting Platforms Of The Contractors Choice Must Be Taken Into Account For The Assembly. No Scaffolding Will Be Provided On Site. The Installation Height On The Room Side Is Approx. +4.85M Above Okf, Upper Edge Approx. +6.50M Above Okff. - Notes On Sectional Processing Assembly Should Be Carried Out Primarily During The Holidays. The Contractor Must Calculate The Assembly In Up To 4 Sections. - Deadlines The Execution Of The Service Described Below Is Independent Of The Contractors Renovation Work, But Must Take School Operations Into Account. The Work Should Be Carried Out On Each Half Of The Building During Holiday Periods. The Following Are Planned For This: Assembly On The South Side 43 Systems - Summer Holidays 2026 (Period 32-36 Week) Assembly On The North Side 65 Systems - Christmas, Carnival Or Easter Holidays 2027 At The Choice Of The Contractor, Completion By April 3, 2027 At The Latest In Coordination With The School Management, A Shorter Execution Time Can Be Agreed, Saturday Work Is Permitted.
Contact Information
Address
Glärnischstraße 1-3
Contact No.
+49 75412043054
Email
vergabe@bodenseekreis.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110481722
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.