|
Lot 1 - Removal Of Existing Tank Baffles. 02/01/03 (2.55M Width Tank 01/02 ((19, 70*4, 3)*2) 169, 45Tank 03 (21, 22X4, 30) 91, 25Tank. 04 (7, 40X3, 5) 25, 90Tanq 05/06 (8X3, 5)*2 56, 00Tanq 07 (7, 60X3, 5) 26, 60Tanq 08/09/10/11 (8, 30X3, 5)*4 116, 20, Lot 1 - Crystallizing Waterproofing For Wet Areas Tanq 01/02 ((19, 45 Tanq 03 (21, Lot 1 - Supply And Installation Chicanas - Material (Frp / Prfv (Fiberglass Reinforced Frp/Grp)) With All Equipment And Material Necessary For Perfect Functioning. Minimum Thickness Of 05Mm Up To 08Mm-Tank 02/01/03 (2.55M Width 03/13/2026 - 18:06:43, Lot 1 - Removal Of The Decantation Plates (1.04M Thickness) And Structure Decant.01/02 (4, 60X 14, 29) 50 Decant. 05 (5, 75 ((5, 55+5, 55+ 12, 70+12, 70) ((14, Lot 1 - Supply And Installation Of Hive Type System And Fixing Structure. Decant.01/02 (12, 53X3, 5) X 2 87, 75Decant. 03 (4, 65 55, Lot 1 - Removal, Separation And Replacement Of Filtering Material (Sand, Pebbles And Anthracite) Filter 03/09 Filtering Sand 0.45 To 0.55M 0.5 Cm Coverage (5.00 0, 20 Cm Coverage (5, 00X2, 40)*7 Tanks 2, 50 Filter 01/02 Sand 1M Coverage (4, 90 8 A 1 Mm 0.4M- Filter 01 A 09 - 20, Lot 1 - Removal Of Leopoldo Blocks/False Bottom Filter 01/02 - 3.25 Comp. 30 Width (18 Units/Tank)*7 Tanks 126, Lot 1 - Repair Of Cracks And Fissures And Other Repairs To Masonry Filter Filter 01/02 - ((3, 25+3, 25+4, 9+4, 9)X4, 60)*2 150, 00Filter 03/09 ((2, 40+2, 40+5, 00+5, 00) Pashal Calha Pashalcalha 01 (8, 10+8, 10+1, 50+1, 5) 90, Lot 1 - Removal And Replacement Of Measuring Ruler Removed From Manual Requa - Gutter 01/02 2, Lot 1 - Supply And Installation Of Ultrasonic Meter, With All Equipment And Parts For Complete Operation And Flow Measurement Results Gutter 01/02, Lot 1 - Decanted Water Trough With Reservoir Repair. Cracks And Fissures And Other Repairs In Masonrycalha 01 (17, 83+ 17, 83+ 1, 49+1, 49) Cracks And Other Repairs In Masonrygutter 01 - (11, 93+11, 93+0, 97+0, 97)X1 26, 00Gutter 02 - (15, 41+15, 41+0, 73+0, 73)X1 33,
|