Cycle Path Construction Work – Construction Between Eurovelo14, Tiszafüred-Hortobágy. Preparation Of Construction Plans For A Bicycle Path On A New Continuous Track Between Tiszafüred And Hortobágy Hinterland And Implementation Of The Bicycle Path In The Framework Of An Enterprise Contract Based On The Detailed Construction Plans Detailed Below. The Task Of The Successful Tenderer Is To Prepare The Complete Construction Plan Documentation Necessary For The Implementation Of The Project Based On The Available Building Permit Plans And Building Permit, Which Includes Participation In The Conclusion Of Tripartite Utility Agreements Between The Utilities – Contractor – Customer (If Requested By The Utility Provider). In Particular, The Task Includes The Preparation Of Additional Appropriation Plans Necessary For The Expropriation Of Foreign Lands On The Basis Of Land Demand Plans Arising During The Preparation Of Construction Plans, And Their Authorization (Delivering Additional Appropriation Plans With Double Clauses. The Main Features Of The Investment: - 22.3 Km Of Independent Bicycle Path With Asphalt Pavement - 9.7 Km Of Paved Bicycle Path With Asphalt Pavement - Embankment Cycle Path With Stabilized Pavement 2.9 Km - Bicycle Lane Designation With Traffic Engineering Devices 1 Km - Pedestrian And Cycle Path 1.2 Km - Bicycle Structure Over The Canal 1 Pc - Renovation Of The Wooden Tourist Bridge Cover 100 M2 Road Number: Eurovelo 14 (Cycle Path Belonging To The National Cycle Path Trunk Network) Starting Section Based On Construction Permit Plans Tiszafüred 0+000 Km Section Final Section Hortobágy Inland Area 7+675 Km Section Technical Parameters: Type Of Facility: Independent Bicycle Path Design Speed: 2X1 Lane Main Intersections: Tiszafüred – Hortobágy-Halastó Plan Package 28+770 Kmsz No. 108 Crossing Hortobágy-Halastó - Balmazújváros Plan Crossing No. 108 Bridge Structures Over The Árkus Canal 15.30 M Renovation Of The Hortobágy - Balmazújváros Plan Package. Other Facilities The Replacement Of All Utilities In The Planning Area Must Be Planned. The Winning Bidders Task Is To Review The Railway Crossings And Insurance Methods, If Necessary, To Obtain The Construction Permit On The Determination Of The Insurance Method Taking Into Account The Plans, Amending The Construction Permit If Necessary. The Task Of The Winning Bidder Is To Design 1 Rest Area Along The Route, Which Needs To Be Tested For The Supply Of Drinking Water
Contact Information
Address
Alkotmány Utca 5
Contact No.
+36 300980565
Email
kozbeszerzes@ekm.gov.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110372017
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.