|
Granulometry Test Of The Base Aggregate. (Un)Particle Size Test Of The Base Aggregate. (Un), Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Base. (Un)Specific Mass Test - In Situ - Sand Bottle Method (Degree Of Compaction) - Base. (Un), Reflective Signage Plate-Octagon (0, 2160 M2/Ud) + Metallic Support. (Un)Reflective Signage Plate-Octagon (0, 2160 M2/Ud) + Metallic Support. (Un), Horizontal Signaling Strip - Thermoplastic Spray - E=1.5 Mm. (M2) Horizontal Signaling Strip - Thermoplastic Spray - E=1.5 Mm. (M2), Horizontal Signaling Strip With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2). (M2) Horizontal Signage Strip With Solvent-Based Acrylic Resin Paint - (0.034 M2/M2). (M2) Stone Dust For Laying Sidewalks, Crushed Ballast, Gravel, Regularization, Formation And Compaction Of Bed For Laying Sidewalks/Slabs/Blocks. (M2)Regularization, Formation And Compaction Of Bed For Laying Sidewalks/Slabs/Blocks. (M2), Cbuq - New Tracos - Traco 6 - Range Â??Dâ? - (Quantity Less Than 10,000 Ton) Tone). (Ton) Cap Supply - Cbuq (Quantity Less Than 10,000 Ton). (Ton), Supply Of Rr-1C Emulsion - Bonding Paint. (Ton) Supply Of Rr-1C Emulsion - Bonding Paint. (Ton), Bonding Paint With Rr-1C - Exclusive Emulsion. (M2)Connection Paint With Rr-1C - Exclusive Emulsion. (M2), Rr-1C Emulsion Supply - Printing Rr-1C Emulsion Supply - Priming, Printing With Rr-1C Emulsion - Exclusive Emulsion. (M2)Priming With Emulsion Rr-1C- Exclusive Emulsion. (M2), Track Cleaning And Washing (Recape). (M2) Track Cleaning And Washing (Recape). (M2), Graduated Brita. (M3)Graduated Brita. (M3), Bica Corrida. (M3)Bica Corrida. (M3), Energy Sink With Handstone Tube Ø 0.60Energy Sink With Handstone Tube Ø 0.60, B.L. Double Masonry H Up To 1.20 Mb.L. Double Masonry H Up To 1.20 M, B.L. Single Masonry H Up To 1.20 M. (Un)B.L. Simple Masonry H Up To 1.20 M. (Un), Body Of Bstc ø 0.60 Without Berth With Simple Frame Pa-1 (M) Body Of Bstc ø 0.60 Without Berth With Simple Frame Pa-1 (M), Mouth (Wing) Of Bstc ø 0.60 Mouth (Wing) Of Bstc ø 0.60 M, Backfilling And Mechanical Piling. (M3) Backfilling And Mechanical Piling. (M3), Excavation Of Culverts In 1St Category. (M3) Excavation Of Culverts In 1St Category. (M3), Construction Plate 4.00 X 2.00 M, Made Of Galvanized Steel Sheet, Including Wooden Frame And Spikes. (Un)Building Plate 4, Including Wooden Frame And Spikes. (Un), Supply And Laying Of Alert/Directional Concrete Tactile Flooring 20X20cm Red. (M2)Supply And Laying Of Alert/Directional Concrete Tactile Flooring 20X20cm Red. (M2), Execution Of Walkway (Sidewalk) Or Concrete Floor, With Concrete Molded In Place - Machined C25 Mpa, Textured Finish (Hairstyle), Not Reinforced Execution Of Walkway (Sidewalk) Or Concrete Floor, Not Reinforced, Bituminous Binder Application Rate Control Test. (Un)Rate Control Assay
|