Work Detail
Landscaping Work – Landschaftsbauarbeiten Ze2. Lmu Osh Täf, Campus 2 Development - Earthworks (Soil Removal Approx. 3,800 M3, Soil Application Approx. 6,500 M3, Topsoil Approx. 1,500 M3, Topsoil Troughs Approx. 4,000 M2.) - Technical Installations (Drainage Channels Approx. 53 M, Facade Gutters Approx. 185 M, Shafts Approx. 21 Pcs, Pipelines Approx. 570 M, Gravel Trenches 5 Pcs) - Surfacing Work (Asphalt Approx. 890 M2, Large Format Concrete Slabs Approx. 2,520 M2, Concrete Paving Approx. 1,700 M2, Water-Bound Ceiling Approx. 665 M2, Concrete Slatted Floors Approx. 250 Pcs, Gravel Lawn 120 M2) - Concrete Work, (Prefabricated Concrete Seating Steps Approx. 217 Pcs) - Furniture (Tables 48 Pcs, Benches 96 Pcs, Flagpoles 4 Pcs) - Equipment Elements (Benches 8 Pcs, Bicycle Racks 75 Pcs) - Locksmith Work (Steel Construction Walkways Approx. 8.5 T) - Tree Planting (80 Pcs) - Hedge Planting (310 Pcs) - Sowing (11,250 M2) - Disposal (Garden And Park Waste Approx. 288 T)
Contact Information
Contact No.
0049896933210
Email
vergabestelle@stbam2.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access