|
Tender for Ht Line (Supply Part) , Supply Of 9.00 Mtr. Long Isi Marked Swaged Steel Tubular Pole As Per Is: 2713/1980 (Part-A) As Amended From Time To Time, Along With Cap Welded On Top & Cast Iron Base Plate Of Designation 410Sp-47 , Supply Of 10:00 Mtr. Long Isi Marked Swaged Steel Tubular Pole As Per Is: 2713/1980 (Part-A) As Amended From Time To Time, Along With Cap Welded On Top & Cast Iron Base Plate Of Designation 410Sp-47 , Supply Of Reinforced Cement Concrete Muff , Supply Of Acsr 6/1/4.72 Sqm , Supply Of Lt Stay Set & With Stay Wire Complete In All Respect , Supply Of Nuts And Bolts , Supply Of Ms Channel Iron (100X50x6mm), Length: 2800 Mm X2 Nos , Supply M.S.A.I Bracing Set (2125X50x50x6)2Mm , Supply Ms Anglre Iron (50X50x6mm) Length: 2800, 2Nos , Supply X-Arm Channel Iron (75X40x5mm), Length: 2800 , Supply Anchoring Assembly For Ht , Supply Mvt Connector , G.O. Switch Handle Supporting C.I. (75X40x6) Length 460Mm , providing G.O. Switch Unit (11Kv, 400A, 25 Ka) , providing D.O Fuse Unit , Discs Insulator Sets (Comprising 1 No. Disc: ^^(Porcelain, Bs, 12 Kv, 90 Kn) Including Dead End Clamps Etc.) , 11Kv Pin Insulator , providing Half Clamp , providing Full Clamp , Erection Part , Manual Carriage Of 9/10:00 Mtr. Pole For 1Km Ht Line Average Distance From Road Head To Site Of Work (Average Lead=0.3Km) , Erection Of Steel Tubular Pole Complete Viz Digging Of Pit, Erection Of Pole, Fixing Of Insulator, Concreting Of Reinforced Cement Concrete Muff, Filling Of Pit+Ramming, Painting Of Pole And All Steel Items (Punching Of The Poles Is Stricitly Not Allowed) , Erection Of Steel Tubular Pole (Six Pole Strengthening ) Digging Of Pit, Drilling Of Holes In X- Bracing Set, X-Arm, Erection Of Pole, Fixing Of Insulator X-Arm X-Bracing Set, Fixing Of Barbed Wire Danger Plate , Concreting Of Reinforced Cement Concrete Muff, Filling Of Pit+Ramming, Painting Of Pole And All Steel Items (Punching Of The Poles Is Stricitly Not Allowed) , Laying Sagging & Binding Of Acsr 6/1/4.72 Sqmm , R-Stringing , Re-Sagging & Binding Of Acsr 6/1/4.72 Sqmm , Sagging Of Ab Cable , Installation Of Suspension Anr Tension Assembly Etc. , Erection Of Do Fuse , Erection Of Go Switch , Erection Of Stay Set Lt (Digging Of Pit, Fixing Of Stay Rod, Filling Of Pit , Nozzeling & Tighting)
|