Bids Are Invited For Repl Of Main Rails And Raising Of Rails - Replacement Of Main Rails And Raising Of Rails As And When Required , Tightening, Repl. Of All Bolts, Clits. - Tightening Of All Bolts And Replacement Of Clits Of Main Rail. , Repl,Re Fixing Of Bushes - Replacement/Re-Fixing Of Bushes Of Wagon Tippler , Repl Of Spur Gear Assembly - Replacement Of Spur Gear Assembly By New One/Repaired One Of Wagon Tippler , Repl Of Rack Pinion - Replacement Of Rack Pinion Of Wagon Tippler/Rigid Coupling Set Of Wagon Tippler/ Shaft Of Wagon Tippler , Oh Of Reduction Gear Box - Overhauling Of Reduction Gear Box Of Tippler , Replacement Of Sector Gear - Replacement Of Sector Gear (Rack Segment) Of Wagon Tippler , Alignment, Grouting Of Tippling Base Rollers - Alignment, Grouting Of Tippling Base Rollers After Lifting The Tippling Table Base Plate Of Wagon Tippler , Repl,Repairing Of Hopper Grill - Replacement/Repairing Of Hopper Grill (One Grill) Of Wagon Tippler , Alignment Of Tipplers , Repl,Repairing Of Outboard Stool - Replacement/Repairing Of Outboard Stool Of Wagon Tippler , Dismantling,Repl Of Top Pivot Housing - Dismantling & Replacement Of Top Pivot Housing Of Wagon Tippler , Repl Of Wooden Block - Replacement Of Wooden Block Of Wagon Tippler , Matching Of Teeth Of Sector Gear - Matching Of Teeth Of Sector Gear & Rack Pinion At Both End , Re-Fixing Lock Lever - Re-Fixing Lock Lever After Repair/Replacement Of Lock Lever Bush And Pin Of Wagon Tippler Table Locking Assembly , Repl Of Top Stop Locking Gears Assly - Replacement Of Top Stop Locking Gears Assembly By New One/Repaired One , Side Beam Fixing Of Tippler , Alignment Of Motors Of Wagon Tippler - Alignment Of Motors Of Wagon Tippler Along With Replacement Of Their Coupling Bolts And Rubber Bushes Etc , Servicing Of Spray Line Valve Size 4 Inch , Servicing Of Spray Line Valve Size 3 Inch , Servicing Of Spray Line Valve Size 2 Inch , Oh Of Overhead Spray Pumps - Overhauling Of Overhead Spray Pumps , Servicing Of Spray Nozzles - Servicing Of Spray Nozzles Of Each Lines Of Spray System Of Wagon Tippler , Lifting, Proper Fixing Of Vf Tray - Lifting Tray & Proper Fixing Of Vibrating Feeder Tray After Adjusting/Replacement Of Its Rubber Pads , Changing, Fixing Of Side Packing - Changing Of Side Packing And Proper Fixing To Avoid Coal Leakage , To Provide The Patches - To Provide The Patches On Leakage Points In Different Chutes Of Wagon Tippler , Repl Of Plates Of Vf Tray, Chutes - Replacement Of Liner Plates, Mother Plate Of Different Thickness Of Vf, Chutes , Removal Of Foreign - Removal Of Foreign M.S. Plate Which Struck Into The Chute Of Vibrating Feeder & Hopper After Gas Cutting Or By Utilizing Cutting Electrode , Fillings Oil In Gear Box - Fillings Oil In Gear Box Of Wagon Tippler , Servocoating,Tightening, Repl Of Damaged Bolts - Tightening & Replacement Of Damaged Bolts Of All Rack Segment Fitted Rack, Couplings & Bush Housing Along With Application Of Servo Coat On Spur Gear Rack And Pinion , Greasing Of All The Nipple Point - Greasing Of All The Nipple Points Of Wagon Tippler , Repl Of Break Shoe Liner - Replacement Of Break Shoe Liner Of Wagon Tippler , Repl Of Main Rail Beam Of Wagon Tippler - Replacement Of Main Rail Beam Of Wagon Tippler By Repaired Beam , Provision Of Backup In Main Rail Beam - Provision Of Backup And Seats In Inner Side Of Main Rail Beam Of Wagon Tippler , Work On Central Platform - Work On Central Platform Of Wagon Tippler , Repairing Of Main Rail Beam - Repairing Of Main Rail Beam Of Wagon Tippler , Repairing Of Rollers Of Coal Spill Plates - Repairing Of Rollers Of Coal Spill Plates Of Wagon Tippler , Fab, Erection Of Back Support Of Vf Mouth Chute - Fabrication & Erection Of Back Support Of Mouth Chute Of V.F. , Fab., Installing Of Vf Tray Supports - Fabricating & Installing Of Vibrating Feeder Tray Supports (1A,1B,2A,2B) , Repl Of Coal Spill Plate - Replacement Of Coal Spill Plate Of Wagon Tippler , Repairing Of Pit Platform Of Main Rail Beam - Repairing Of Pit Platform Of Main Rail Beam Of Wagon Tippler , Repl Of Damaged Beam Of Vf - Replacement Of Damaged Beam Of Vibrating Feeder Floor 1A,1B, 2A, 2B , Repairing Of Counter Balance Beam - Repairing Of Counter Balance Beam Of Wagon Tippler , Repairing Of Mdu Base Structure - Repairing Of Base Structure Of Main Drive Unit Of Wagon Tippler , Repairing Of Damaged Split Spur Gear , Fab., Of Mouth Piece Of Vf - Fabrication Of Mouth Piece Of Vibrating Feeder 1A, 1B, 2A, 2B , Erection Of New Fabricated Mouth Piece Of Vf - Erection Of New Fabricated Mouth Piece Of Vibrating Feeder 1A, 1B, 2A, 2B , Oh Of Hoisting System - Overhauling Of Hoisting System Of Wagon Tippler No. 1,2,3, & 4 , Oh Of Hopper Spray Pump, Line - Overhauling Of Hopper Spray Pump & Line , Provision Of Hopper Liners, In Coal Hopper Of Vf - Provision Of Hopper Liners In Coal Hopper Of Vibrating Feeder 1A,1B, 2A,2B , Fab. Erection Of Coal Hopper Partition Stool - Fabrication, Erection Of Coal Hopper Partition Stool Of Wagon Tippler By 12Mm,10Mm,8Mm Plate , Raising And Re-Fixing Of Mouth Piece Of Coal Liner Chute Of Vf - Raising And Re-Fixing Of Mouth Piece Of Coal Liner Chute Of Vibrating Feeder , Repl Of Back,Side Plate Of Mouth Piece - Replacement Of Back/Side Plate Of Mouth Piece , To Attend The Coal Leakage From Top Mouth Piece , Re-Fixing,Repositioning Of Side And Back Supports - Re-Fixing/Repositioning Of Side And Back Supports , Repairing,Reposition Of Side Guards Of Mouth Piece - Repairing/Reposition Of Side Guards Of Mouth Piece , Repl Of Buffer Block And Buffer Pads Of Counter Balance Beam - Replacement Of Buffer Block And Buffer Pads Of Counter Balance Beam Of Wagon Tippler , Repl Of Brake Drum Of Thruster Brake Assly - Replacement Of Brake Drum Of Thruster Brake Assembly , Repl Of Input,Output,Intermediate Pinion Of Gear Box - Replacement Of Input/Output/Intermediate Pinion Of Gear Box Of Wagon Tippler , Fab. And Erection Of Counter Balance Beam - Fabrication And Erection Of Counter Balance Beam Of Wagon Tippler , Repairing Of Wagon Tippler Plate Form By Cutting And Welding , Removing The Fallen Loaded Wagon In Pit - Removing The Fallen Loaded Wagon In Pit Of Wagon Tippler , Inserting The Side Beam Pins In Bracket - Inserting The Side Beam Pins In Bracket Of Wagon Tippler , Dismantling,Removing The Broken Shafts Of Wagon Tippler - Dismantling, Removing The Broken Intermediate,Drive,Non Drive End Shafts Of Wagon Tippler , Installation Of Drive And Adjacent Intermediate Shaft , Cutting, Fabricated And Installation Of Resting Outer Rail Beam Bottom Plate - Cutting The Damage Plate, Fabricated And Installation Of Resting Outer Rail Beam Bottom Plate Total Quantity : 998
|