|
Box Opening Up To 40Cm, Includes Excavation, Compaction, Transport And Preparation Of The Sub-Bed, Npk Chemical Fertilizer, 10:10:10, Peaking Of Concrete Surfaces (With Pneumatic Equipment), Application Of Anti-Graffiti Varnish - Solvent Base - 2 Coats (Removal Of Graffiti Only Dry Or With Soap And Water), Steel Reinforcement Ca-50, Removal Of Guides, Includes Loading On Truck, Removal Of Cobblestones, Bituminous Base Of Materials Coming From Solid Waste From Civil Construction (Rcc) And Or From The Milling Of Asphalt Pavements (Rap) Recycled In A Mobile Plant With Up To 3% Cap, Supply And Application, Does Not Include Transport To The Service Location, Base Recycled Aggregate, With Aggregate Supply, Dense Binder Base (Without Transport), Graduated Crushed Base, Fck=15.00Pa Concrete Base For Guides, Gutters Or Gutters, Double Drain, Crushing Of Materials From Construction Waste, Loading And Removal Of Debris Up To The Average Distance To And From 1 Km, Loading And Removal Of Earth Up To An Average Distance Of 1.0 Km With A 10 M³ Dump Truck, Mechanized Loading And Removal Of Rubble, Including Transport Up To 1 Km, Loading, Unloading And Transportation Of Binders Up To An Average Round-Trip Distance Of 1 Km, Unloading And Transportation Of Asphalt Concrete Up To An Average Round-Trip Distance Of 1Km, Manhole Chimney With Masonry Made Of A Common Brick, Metallic Concrete Of Greater Than 3 M In Height, Assembly And Subsequent Disassembly, Including The Transport Of Materials, Earth Compaction, Measured In The Landfill, Concrete Fck=30Mpa - Machined, Construction Of Gutter Or Concrete Gutter Fck=25, 0Mpa, Cutting Concrete With Diamond Disc Up To A Depth Of 13 Cm, Demolition Of Asphalt Pavement, Including Cover, Includes Load On Truck, Demolition Of Concrete Pavement, Gutter Or Gutter, Demolition Of Concrete Gutters, Mechanized Demolition Of Reinforced Concrete, Mechanized Demolition Of Simple Concrete, Final Disposal Of Soil And Waste, Class Iia - No Inert, In Licensed Sanitary Landfill, Final Disposal Of Soil And Waste, Class Iib - Inert, Dredging Of 1St Category Material With Dragline - 2.1 M³ Bucket - Service Path In Natural Bed - Dmt 2,500 To 3,000 M - With 14 M³ Truck And Loader, Dredging Of 1St Category Material With Excavator Hydraulics - Bucket Capacity Of 1.56 M² - Service Path In Natural Bed - Dmt 2,500 To 3,000 M, Mechanical Excavation For Foundations And Trenches With A Depth Of Less Than Or Equal To 4.0 M, Continuous Wooden Shoring For Pipe Channeling, Plastering And Sanding Of Deteriorated Concrete Elements, Common Form Of Pine Boards - Non-Recoverable, Supply Of Earth, Including Excavation, Loading And Transportation To An Average Distance Of 1.0 Km, Measured In Compacted Landfill, Supply And Application Of Steel Mesh, Supply And Laying Of Reinforced Concrete Pipes, Diameter 60 Cm - Type Pa-2, Diameter 80 Cm - Type Pa-2, Diameter 100Cm - Type Pa-2, Supply And Laying Of Simple Concrete Tubes - Diameter 40 Cm, Supply And Laying Of Box Type Gabion, H= 1.00 M, Mesh 8 65 M, Supply And Laying Of Geotextile Blanket With Longitudinal Tensile Strength Of 10 Kn/M And Transverse Tensile Of 9Kn/M, Supply, Preparation And Application Of Shotcrete, Measured In The Project - Fck=20Mpa - On Construction
|