|
Box Opening Up To 40Cm, Includes Excavation, Compaction, Transport And Preparation Of The Sub-Bed, Npk Chemical Fertilizer, 10:10:10, Peaking Of Concrete Surfaces (With Pneumatic Equipment), Application Of Anti-Graffiti Varnish - Solvent Base - 2 Coats (Removal Of Graffiti Only Dry Or With Soap And Water), Steel Reinforcement Ca-50, 03/06/2026 - 17:37:28, Pulling Out Guides, Includes Loading On Truck, Pulling Out Cobblestones, Bituminous Base Of Materials From Solid Construction Waste (Rcc) And Or From The Milling Of Asphalt Pavements (Rap) Recycled In Mobile Plant With Up To 3% Cap, Supply And Application, Does Not Include Transport To The Service Site, Recycled Aggregate Base, With Aggregate Supply, Dense Binder Base (Without Transport), Graded Crushed Stone Base, Concrete Base Fck=15, 00Pa For Guides, Gutters Or Gutters, Double Storm Drain, Crushing Of Materials From Construction Waste, Load And Removal Of Rubble Up To An Average Round-Trip Distance Of 1 Km, Loading And Removal Of Earth Up To An Average Distance Of 1.0 Km With A 10 M³ Dump Truck, Mechanized Loading And Removal Of Rubble, Including Transport Up To 1 Km, Loading, Unloading And Transport Of Binder Up To An Average Round-Trip Distance Of 1 Km, Unloading And Transport Of Asphalt Concrete Up To An Average Round-Trip Distance Of 1 Km, Manhole Chimney With Common Brick Masonry, Metal Cementing Greater Than 3 M In Height, Assembly And Subsequent Disassembly, Including Transportation Of Materials, Earth Compaction, Measurement In The Landfill, Concrete Fck=30Mpa - Machined, Construction Of Gutter Or Gutter Concrete Fck=25, 0Mpa, Cutting Concrete With Diamond Disc Up To A Depth Of 13 Cm, Demolition Of Asphalt Pavement, Including Cover, Includes Loading On Truck, Demolition Of Concrete Pavement, Gutter Or Gutter, Demolition Of Concrete Gutters, Mechanized Demolition Of Reinforced Concrete, Mechanized Demolition Of Simple Concrete, Final Disposal Of Soil And Waste, Class Iia - Non-Inert, In Licensed Landfill, Final Disposal Of Soil And Waste, Class Iib - Inert, Dredging Of 1St Category Material With Dragline - 2.1 M³ Bucket - Service Path In Natural Bed - Dmt 2,500 To 3,000 M - With 14 M³ Truck And Loader, Dredging Of 1St Category Material With Hydraulic Excavator - Bucket Capacity Of 1.56 M² - Service Path In Natural Bed - Dmt 2,500 To 3,000 M, Mechanical Excavation For Foundations And Trenches With A Depth Of Less Than Or Equal To 4.0 M, Continuous Wooden Shoring For Pipe Channeling, Plastering And Sanding Of Deteriorated Concrete Element, Common Form Of Pine Boards - Non-Recoverable, Supply Of Earth, Including Excavation, Loading And Transport Up To An Average Distance Of 1.0 Km, Measured In Compacted Landfill, Supply And Application Of Steel Mesh, Supply And Laying Of Reinforced Concrete Pipes, Diameter 60 Cm - Type Pa-2, Diameter 80 Cm - Type Pa-2, Diameter 100Cm - Type Pa-2, Supply And Laying Of Simple Concrete Tubes - Diameter 40 Cm, Supply And Laying Of Box Type Gabion, H= 1.00 M, Mesh 8 X 10 Cm, Galvanized, Pvc Coated, Wire Ø = 2.4 Mm, Supply And Placement Of Bag Type Gabion, D= 06.65 M, Supply And Placement Of Geotextile Blanket With Longitudinal Tensile Strength Of 10 Kn/M And Transverse Tensile Of 9Kn/M, Supply, Preparation And Application Of Sprayed Concrete, Measured In The Project
|