1. The Subject Of The Order Is The Development Of Design Documentation And Execution Of Construction Works For The Project Construction Of A Sanitary Sewage System In Sadów, Ul. Podlesie, Located In The Area Belonging To The Koszęcin Commune. The Project Includes The Expansion Of The Sanitary Sewage System, The Construction Of A Sewage Pumping Station With Energy Supply To The Sewage Pumping Station, The Task Of Which Will Be To Pump Sewage From Lower-Lying Areas, As Well As The Reconstruction Of Existing Surfaces And The Restoration Of The Area And Its Elements Development To Its Original State.2. The Planned Construction Of The Sanitary Sewage System Should Ensure The Discharge Of Domestic Sewage To The Existing Sewage System In Powstańców Śląskich Street, And From There To The Sewage Treatment Plant, Where It Will Be Treated. The Network Should Be Buried Below The Ground Frost Zone And Meet All The Requirements Specified In Polish Standards And Separate Regulations Along With Side Outlets To The Property Boundaries And Local Sewage Pumping Stations. Sewage From The Pumping Station Will Be Discharged Through A Pressure Pipeline To Expansion Wells That Are Elements Of The Planned Sanitary Sewage Network. From There, It Will Be Discharged By Gravity To The Existing Sanitary Sewage Collectors At Powstańców Śląskich Street. 53/4, 56, 28/17, 28/1, 28/2, 28/3, 28/4, 28/5, 28/6, 28/7, 28/8, 28/9, 28/10, 28/11, 28/12, 28/15, 28/18, 32, 33/1, 33/2, 33/3, 33/4, 33/5, 33/6, 34/1, 34/2, 34/3, 34/4, 34/5, 34/6, 34/7, 35/1, 35/2, 36/1, 36/2, 36/3, 36/4, 36/5, 37/1, 37/2, 38, 39, 40/1, 40/2, 40/3, 40/4, 40/5, 42, 41, 44/4, 44/3, 44/2, 44/1, 45/1, 46/1, 46/3, 46/4, 46/5, 46/7, 46/8, 46/9, 46/10, 46/11, 46/12, 47, 48, 49/1, 51/1, 51/2, 51/3, 51/5, 51/10, 51/11, 51/12, 51/13, 51/14, 51/15, 51/16, 51/17, 51/18, 51/19, 51/20, 51/21, 53/2, 53/8, 53/9, 57/4, 57/2, 95/2, 96/1, 97/1, 98/1, 98/2, 99, 59/8, 59/2, 59/1, 60/1, 60/3, 60/2, 61, 96/2, 97/2, 100/2, 101, 102/4, 109/3, 109/4, 110/1, 110/2, 102/1, 102/4, 103, 104, 105/2, 105/1, 106, 107/1, 111/1, 112/1, 112/2, 115/5, 115/6, 115/7, 115/8, 115/9, 121, 122, 123/6, 123/1, 124, 126, 127, 128, 129/6, 129/5, 129/4, 73/2, 73/1, 152/1, 152/2, 152/3, 152/5, 152/12,152/13, 152/14, 152/15, 152/17, 152/18, 152/19, 152/20, 152/21, 152/22, 152/23, 152/24, 152/25, 152/26, 152/27, 152/28, 152/29, 152/30, 153/2, 153/1, 536/1, 800.4. Characteristic Parameters: Parameters Determining The Size And Scope Of The Project For The Construction Of A Sanitary Sewage Network With Pumping Stations: - Approximate Length Of The Pressure Sanitary Sewage Network - 500 M - Sewage Pumping Station With Complete Equipment - 2 Pieces - Approximate Length Of The Gravity Sanitary Sewage Network - 3400 M - Approximate Length Of Sewage Outlets To The Property Boundaries - 650 M Note! Indicative And Should Be Treated As An Estimate. 5. The Order Will Be Implemented In The Design And Build Formula In Accordance With Pfu, Generally Applicable Legal Regulati
|