|
The Subject Of The Project Is The Design And Construction Of A Bicycle Path From Strychowo - Myślicin. The Path Runs Along The District Road. It Starts At The Existing Bicycle Path At The Intersection With Provincial Road No. 197 And Continues North Towards The Town Of Strychowo, Where It Ends At The Last Building. − Length Of The Bicycle Path Approx. 990 M, − Width Of The One-Way Bicycle Path – 1.5 M, − Surface Of The Bicycle Path – Bituminous Ac8s, − Expected Traffic - Kr 1, − Drainage – Into The Roadside And Green Areas. In Open Road Ditches, In Tight Wells Connected With A K2-Dren Drainage Pipe, Bicycle Path: - Wearing Course Of Ac8s Asphalt Concrete, 5 Cm Thick, - Sprinkling With Asphalt Emulsion In The Amount Of 0.7 Kg/M², - Substructure Made Of An Unbound Mixture (Broken Aggregate* Mechanically Stabilized With Continuous Grain Size 0/31.5 Mm) With A Thickness 20 Cm, - Sand Bedding 10 Cm, - Subsoil According To Pn-S-02205 (Embankments, Excavations, Retaining Walls). Requirements For Kłsm Crushed Stone Of Fraction 0/31.5 Mm For The Foundation: − Water Absorption Wa24-2 − Frost Resistance F-4 − Resistance To Crushing La ≥ 30 − Homogeneous Aggregate, Free Of Impurities And Admixtures Meeting The Requirements Of Grading Curves For Aggregate For Mechanical Stabilization. As Part Of The Construction Of A Bicycle Path, Pedestrian Crossings With Crossings For Cyclists Should Be Provided. Crossings With Crossings Should Be Marked With Thick-Layer Horizontal P-10/P-11 Markings (With A Red Crossing) And Vertical Active D-6B Markings With Reflective Foil. Crossings With Crossings Should Be Marked With Point Reflective Elements In A Cast Iron Cover, Equipped With Led Lights And A Photovoltaic Panel, Plow-Resistant, Long-Lasting With A Replaceable Reflective Element. One-Sided Reflector. There Should Be 8 Pieces Of Reflective Points Per Crossing. Requirements For Peo: - Reflector: Prp1>250Mcd/Lux, - Working Time Min. 600 H, - Diameter Approx. 180 Mm, - Polycrystalline Photovoltaic (Pv) Panel, - White Color. The Pedestrian Crossing And The Cyclist Crossing Should Be Illuminated And Marked With Active Signs To Make Them Better Perceived By Drivers. Lamp Requirements: - Led Lamps, Light Source: Focusing Lens Luminaire, Light Color Cold White (6000K), Led Luminaire Power 54W, 5400 Lumens, Waterproof Ip67, - D-6 Signs With A Panel With Pulsators Operating Only When The Detector Detects Approaching Pedestrian Movement. - B-120 Foundation. Bituminous Descents: - Wearing Course Of Ac8s Asphalt Concrete With A Thickness Of 5 Cm, - Sprinkling With Asphalt Emulsion In The Amount Of 0.7 Kg/M², - Base Made Of An Unbound Mixture (Aggregate* Broken, Mechanically Stabilized With Continuous Grain Size 0/31.5 Mm) With A Thickness Of 20 Cm, - Reinforcement Of The Substrate With Aggregate Stabilized With C3/4 Cement, 15 Cm Thick, - Substrate According To Pn-S-02205. The Materials Used Will Have Certificates And Technical Approvals And Approvals For Use In Construction In Po
|