|
As Part Of The Task, The Following Are Planned: Works: - Preparation Of The Area For The Investment (Preparatory Works), - Execution Of Earthworks Related To Shaping The Path Route, - Laying The Surface Of The Pedestrian And Bicycle Path, - Installation Of Small Architecture Elements - Educational Boards In Order To Create An Educational Path.Pedestrian And Bicycle Paththe Pedestrian And Bicycle Path Has Been Planned On The Following Kilometer: From Km 0+000 To Km 1+095. Assumptions For The Designed Path: - Width. Traffic Lane 2.5 M, - Surface - Crushed Stone 0-31.5 Mm Thick. 10 Cm, - Edge Reinforcement - Concrete Pavement Edge 6X20x100 Cm, Gray. List Of Structural Layers Of The Path: - Wearing Course, Crushed Stone, 0-31.5 Cm Thick. 10 Cm, - Profiled And Compacted Subsoil, Total Surface Structure: Thickness. 10 Cm. The Culverts Under The Path Will Be Finished With Concrete End Walls. Prefabricated. The Planned Works Include Carrying Out The Necessary Earthworks And Drainage - Using Transverse Slopes Of The Surface And Slopes Of The Gradeline, Which Will Allow Excess Rainwater To Be Drained From The Path Surface To The Ground Roadside. Educational Trail - Elements Of Small Architecture As Part Of The Implementation Of The Investment, It Is Planned To Create An Educational Path Located Along The Newly Designed Pedestrian And Bicycle Route Running In The Vicinity Of Lake Chodeckie. The Key Element Of The Path Will Be Educational Boards Whose Task Will Be To Convey Knowledge About The Local Natural Environment And Cultural Heritage As Well As The Rules Of Behavior In Valuable Natural Areas, Which Will Be An Attraction For Tourists Visiting The City And Commune Of Chodecz. Educational Boards Should Be Made In An Aesthetic And Durable Form - On Wooden Structures, Harmonized With The Natural Surroundings. The Content Of The Boards Will Be Adapted To Different Age Groups, With Particular Emphasis On The Educational Function For Children And Teenagers. The Topics Of The Boards Will Include, Among Others: Flora And Fauna Of The Region, The Lake Ecosystem, Nature Protection Principles And Historical Curiosities Related To The Area Of The Chodecz Commune, Etc. As Part Of The Creation Of The Path, It Will Be Planned. Purchase And Installation Of: - Free-Standing Horizontal Educational Boards - 6 Pcs., - Educational Game Boards - 4 Pcs. 5. A Detailed Description Of The Subject Of The Order Is Included In The Construction Design, Which Constitutes Annex No. 5 To Swz.6. The Contractor, Without Additional Remuneration, Undertakes To: 1) Carry Out All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Supply The Necessary Utilities For The Implementation Of The Subject Of The Contract, Including: Electricity, Water, Etc. And Bear The Costs Of Their Consumption, Based On The Re-Invoice Issued By The Ordering Party For The Utilities Actually Used, 2) Bear The Costs Of Necessary Utilities For The Purposes Of Impleme
|