|
The Subject Of The Investment Is The Superstructure, Expansion And Reconstruction Of The Building Of The Cultural Center In Kielanówka, Kielanówka 315, Together With Technical Infrastructure, On The Plot No. 492/5, Precinct 0002 Kielanówka. In Its Existing State, The Development Area Is 436.50 M2, The Designed Usable Area Will Be 462.90 M2, And The Total Area Subject To Reconstruction, Expansion And Addition Is 708.30 M2. As Part Of The Task, Dismantling Works Are Planned In The Current 2-Story Building, Consisting Of The Demolition Of The Buildings Roof, The Addition Of A Second Floor And The Construction Of A Flat Roof (Flat Ceiling), As A Result Of Which 3-Story Building. The Reconstruction Includes A Change In The Functional Layout, An Additional Sanitary Facility And A Change In The Entrance Area. The Scope Of Works Includes: Horizontal And Vertical Insulation Of Basement Walls, Construction Of An Elevator Shaft And Installation Of A Passenger Elevator, Replacement Of Floors, Brickwork, Installation Of Windows And Doors, Construction Of A Staircase From The Mezzanine To The First Floor, Installation Of Sheet Metal Flashings, Window Sills, Gutters And Downspouts. Construction: External And Internal Walls Made Of Ceramic Elements And Concrete, Full Non-Ventilated Flat Roof With A Reinforced Concrete Slab Structure. 16 Cm And A Ceiling Made Of Hc265 Prestressed Ceiling Slab (In Part Of The Building), Covered With Underlay And Topcoat Thermal Felt. The Walls Above The Roof Are Topped With An Attic. The External Walls Are Smooth, Plastered And Varied In Color. Window And Door Joinery And Joinery: Aluminum, Steel And Pvc, Aluminum Window Facades And Corner Facades Will Be Installed. The Building Will Be Plastered, Walls Painted, Suspended Ceilings, Floors And Sanitary Ware Installed. The Investment Will Include The Dismantling And Construction Or Reconstruction Of Internal Installations: Water, Hydrant, Sanitary Sewage, Electrical, Telecommunications, Internal And External Monitoring, Burglary And Attack Detection, Gas, Ventilation, Air Conditioning And Central Heating. In Order To Reduce Energy Consumption During The Use Of The Cultural Center Building, The Facility Will Use Led Fixtures For General, Emergency And Evacuation Lighting As Well As External Lighting, As Well As A Photovoltaic Installation To Obtain Energy From Renewable Energy Sources. The Scope Of Work Includes The Delivery And Installation Of Photovoltaic Panels With A Total Capacity Of 8.9 Kwp On The Roof Of The Building. External Works Include The Reconstruction Of The Water Supply Network, Sanitary Sewage System And Telecommunications. New Elements Of Technical Infrastructure Will Include: A Water Supply Connection (Change In Diameter), A Metering Power Cable Connection, A Section Of Telecommunications Sewage System And A Telecommunications Connection. External Works Will Also Include Leveling The Area For The Construction Of A New, Adapted For Disabled People, Entrance Zone To
|