|
1.1 - Supply And Placement Of Construction Sign Made Of Galvanized Sheet 26, Esp. 0.45Mm, Dimension 3X1.5M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Support In Autoclaved Eucalyptus Painted With Pva Paint Two 2 Coats20260306, 1.2 - Mobilization And Demobilization Work Far From Urban Center With Value Between 1,000,000, 01 And 3,000,000, 00 20260306, 1.3 - Shed Work, In Resin Plywood Sheet, Including Sanitary Installations And Furniture - Der-Mg20260306 Standard, 2.1 - Reinforcement Of The Sub-Bed With Addition Of 3% Lime And Compaction To 100% Execution, Including Supply Of Lime, Excavation, Loading, Unloading, Homogenization, Moistening, Spreading And Compaction Of The Material20260306, 2.2 - Base, With Mixture In The Track, 67% Of Soil And 33% Of Running Spout, Compacted In The Energy Of The Intermediate Proctor Execution, Including Supply Of The Running Spout, Excavation And Loading Of The Deposit Material, Spreading, Moistening, Homogenization And Compaction Of The Mixture, Excluding The Acquisition Of Soil And Transport Of Materials.20260306, 06/03/2026 - 11:11:05, 06/03/2026 - 11:11:07, 06/03/2026 - 11:14:52, 2.3 - Sub-Base, Without Mixing, Including Excavation, Wetting And Compaction Of Material, Excludes Acquisition And Transportation Of Material20260306, 2.5 - Mechanical Excavation In 1St Category Material, Including Loading In Truck, Excluding Transport And Unloading Eai20260306, 2.8 - Rr-1C Connection Paint 20260306, 2.9 - Supply Of Bituminous Material Rr-1C 0Bdi Differentiated To Be Applied For Supply Of Bituminous Material And Deposit Material. 20260306, 2.10 - Freight Of Bituminous Material - Differentiated Der0bdi To Be Applied For Supply Of Bituminous Material And Deposit Material. Formula For Freight Cost: 0.7545 0 Distance In Km + 47.938620260306, 2.11 - Execution And Application Of Cbuq Hot Machined Bituminous Concrete, Commercial Mass, Including Supply And Transport Of Aggregates And Bituminous Material, Exclusive Transport Of Asphalt Mass To Pista20260306, 2.12 - Transport Of Hot Bituminous Mixture With Truck With 6 M³ Thermal Bucket - Paved Highway20260306, 3.3 - Strip Painting With Acrylic Paint - Thickness Of 0.6 Mm20260306
|