|
Lot 1 - Technical Responsibility Document, Lot 1 - Mobilization And Demobilization Of Site, Lot 1 - Polyethylene Water Tank, 3000 Liters - Supply And Installation. Af_06/2021, Lot 1 - Temporary Wooden Structure To Support A 3000 Liter Elevated Water Tank. Af_03/2024, Lot 1 - Temporary Light, Power, Telephone And Logic Installations, 03/05/2026 - 14:39:21, Lot 1 - Temporary Sewage Installations, Lot 1 - Temporary Water Installations, Lot 1 - Temporary Light And Power Connection - Pd. Goinfra, Lot 1 - Temporary Water Connection (Including Sanitary Sewer Removal) - Pd. Goinfra, Lot 1 - Protection Box For Single-Phase Built-In Meter - Supply And Installation. Af_07/2025, Lot 1 - Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Lot 1 - Conventional Location Of Work, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, Lot 1 - Attack Plan, Lot 1 - Waste Management Plan In Civil Construction - Pgrcc, Lot 1 - Occupational Safety Project, Lot 1 - Local Administration, Lot 1 - Night (Daily) And Daytime (Weekends) Surveillance Service, Lot 1 - Permanent Cleaning Of The Site And Internal Transport, Lot 1 - Rental Of Container 2, 30 Lot 1 - Horizontal Excavation, Including Loading And Unloading In 1St Category Soil With Crawler Tractor (150Hp/Blade 3, 18M3). Af_07/2020, Lot 1 - Mechanized Trench Backfilling With Hydraulic Excavator (Bucket Capacity 0.8 M/Power 111 Hp), Width From 1.5 To 2.5 M, Depth Up To 1, With Soil (Without Replacement) Of 1 Category, With Percussion Soil Compactor. Af_08/2023, Lot 1 - Removal Of Remaining Roots Of Tree Trunk With A Diameter Greater Than Or Equal To 0.20 M And Smaller Than 0.40 M. Af_03/2024, Lot 1 - Shallow Cutting And Trimming Of A Tree With A Trunk Diameter Greater Than Or Equal To 0, Lot 1 - Demolition Of Floor Simple Concrete, Mechanized With A Hammer, Without Reuse. Af_09/2023, Lot 1 - Pruning To A Tree Height With A Trunk Diameter Of Less Than 0.20 M. Af_03/2024, Lot 1 - Pruning To A Tree Height With A Trunk Diameter Of Greater Than Or Equal To 0, Lot 1 - Loading, Maneuvering And Unloading Of Soil And Granular Materials In A 10 M Dump Truck - Loading With Pa Loader (Bucket From 1.7 To 2.8 M / 128 Hp) And Free Unloading (Unit M3). Af_07/2020, Lot 1 - Transport With 10 M Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit M3xkm). Af_07/2020, Lot 1 - Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, Lot 1 - Pipe, Pvc, Weldable, 25Mm, Installed In Water Branch Or Sub-Branch - Supply And Installation. Af_06/2022, 32Mm, 50Mm, Installed On A Water Distribution Branch - Supply And Installation. Af_06/2022, Ppr, Dn 32, Class Pn 25, Installed In Water Distribution Branch Supply And Installation. Af_08/2022, Lot 1 - Short Adapter With Bag And Thread For Registration, Dn 25Mm 50Mm, Lot 1 - Transposition Curve, Installed In Distribution Branch
|