Architectural And Related Services – 0241.00_ City Of Karlsruhe-Neureut School Center, South Building - Modernization. Description Of The Planning Task And The Construction Project: The Neureut School Center Was Built In Two Construction Phases Between 1970 And 1975 Using Solid Construction And Prefabricated Reinforced Concrete Elements. The Neureut High School And The Neureut Secondary School Are Housed In The School Building. Both Schools Have Three Classes. The School Building Has A Gross Floor Area Of 14,650 M² And Consists Of Three Building Parts And Six Staircases That Are Shared By Both Schools. In The North Building There Is The Cafeteria, School Teaching Kitchen And Specialist Rooms On The Ground Floor As Well As Classrooms On The 1St And 2Nd Floors. The Central Building/Intermediate Building Contains The Entrance Area/Foyer, Specialist Rooms And Administration. In The South Building There Are Additional Administration Rooms, Teachers Rooms And Science Rooms On The Ground Floor As Well As Classrooms On The 1St And 2Nd Floors. There Are Other Buildings On The School Grounds; To The East Is The Study Hall (All-Day Care), To The Southwest Is The Sports Hall And To The West Is The Caretakers House. Two 2-Story Interim Buildings (Container West And Container East) Were Built For Partial Relocation During The Construction Work. Initial Situation And Reason: There Is A Need For Modernization In Various Places In The School Building. In Addition, Fire Protection In The Building Must Be Improved. For This Purpose, A Planning Team Was Commissioned In 2018 Via A Vgv Procedure. Current Project Status: Service Phases 2-7 According To Hoai § 34 Have Been Completed For All Parts Of The Building. In The North And Middle Buildings As Well As In All Stairwells, Work Phase 8 Will Be Completed By The End Of 2026. Preliminary Measures (Emergency Sealing Of Flat And Slatted Roofs Above The Ground Floor) Were Carried Out For The South Building. Through The New Vgv Procedure, A Suitable Planning Office Is Being Sought For The South Building, Which Will Handle Service Phases 8-9 As Well As Partial Services Of Service Phases 5-7 Hoai § 34 For This Part Of The Building. It Is Imperative To Build On The Existing Planning. So Far, Only Preliminary Considerations Have Been Created For The Barrier-Free Access That Still Needs To Be Added (South Elevator + Foyer Platform Lift). For This Purpose, The Services Of Service Phases 2-9 Hoai § 34 Should Be Processed. Modernizing The Facade Is Not Part Of This Measure. New Window Elements Are Only Planned In The Rooms In Which New Window Openings Are Created As A Result Of The Existing Design Planning. Measures For Barrier-Free Access: - South Elevator (Access To Ground Floor Foyer, Ground Floor South, 1St Floor Zwb, 1St Floor South, 2Nd Floor South) - Platform Lift Foyer (Access To Ground Floor Foyer, Ground Floor North) Measures Building South: - Basement South - Ground Floor South Foyer: Production Of The Teachers Toilets, Including Pollutant Remediation, Suspended Ceilings - Ground Floor South Nwt + Administration: Conversion And Modernization Of The Natural Sciences And Administration Areas Including Pollutant Remediation And Renewal The Building Services - Ground Floor South Roof Area Low-Rise Building: Modernization Of Flat Roof With Shed Roof Glazing - 1St + 2Nd. Upper Floor South: Creating Connecting Corridors
Contact Information
Address
Zähringerstraße 61
Contact No.
+49 61314819600
Email
info@hs-psbm.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110038314
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.