|
Construction Work For School Buildings – Construction Of Buildings With The Function Of A High School, Sports Facilities, Dormitory, Canteen, Conference Spaces, Related Spaces, Setting Up Premises, Making Connections, Fencing, Relocation Of Substations, Location Of Heat Pumps, Organization Of The Construction Site To Achieve The Investment Objective Of The Technical College Of Post And Telecommunications Gheorghe Airinei. The Purpose Of The Project Is To Develop A Modern And Integrated Educational Campus For The Gheorghe Airinei Technical College Of Posts And Telecommunications, In Order To Improve The School Infrastructure In Sector 6 And Support A Quality Educational Process, Adapted To The Current Requirements Of The Labor Market. Through The Implementation Of This Project, We Want To Transform The High School Into A National Educational Hub In The Field Of Telecommunications, As Well As A Center Of Excellence In Professional Training, Supporting Both Students From Bucharest And From The Expanding Metropolitan Area. • General Investment Objective Data Building Buildings With The Function Of A High School, Sports Facilities, Dormitory, Canteen, Conference Spaces, Related Spaces, Setting Up Premises, Creating Branches, Fencing Land, Organization Of The Construction Site For The Achievement Of The Investment Objective Gheorghe Airinei Technical College Of Posts And Telecommunications. • Location: Strada Romancierilor No. 1, Sector 6, Bucharest • Beneficiary: Sectorul 6 Of The Municipality Of Bucharest (City Hall Sector 6) • Designer: Centrul De Inovare Si Proiectare Sector 6 S.R.L. The Purpose Of This Public Procurement Procedure Is To Carry Out The Construction Works, According To The Technical Documentation (Pt And Dde), To Achieve The Investment Objective Involving 2 Stages, The First Stage Not Being The Subject Of The Public Procurement Procedure, As Follows: O Phase Of Dissolution Works (Not The Object) This Stage Corresponds The Period In Which The Existing Construction Activities Are Carried Out, Including All The Operations Necessary To Transform The Site From An Above-Ground And Underground Structure Into A Free Land. The Specific Activities Include: - The Evacuation Of Waste Resulting From The Dismantling; The Collection And Delivery Of Reusable Materials (Metal, Wood, Cables) To The Competent Authorities; - The Temporary Arrangement Of Some Barracks And Equipment Necessary To Support The Dismantling Activities. Oconstruction Work Stage - Creation Of An Educational And Cultural Center, With Facilities For Both The Local Community And Residents Of Sector 6. The Materials Brought To The Site Will Be Stored In The Areas Designated By The Site Organization Plan, Respecting The Storage Conditions Indicated By The Suppliers, To Prevent Degradation Caused By Environmental Factors Or Improper Handling. The Supply Of Materials Will Be Correlated With The Sequence Of The Execution Stages, To Avoid Overcrowding Storage Areas And To Facilitate The Smooth Running Of The Works. The Operating Regime Of The Gheorghe Airinei Technical College Is A Complex One, In Addition To The Subjects Of A Technical, Theoretical And Vocational High School, The Emphasis Is Also On Dual Education, Professional And Post-Secondary Training Courses. In This Sense, The New Campus Aims To Satisfy The Demands Of Economic Partners
|