Excavating And Earthmoving Work – Westfalenhallen Dortmund, Construction Project Südhallen, Ve50 Infrastructure Measures. The Infrastructure Work Contract To Be Awarded Includes The Construction And Construction Of Construction Roads, Earth Excavation And Shoring Work For Utility Trenches. In Addition, Rain And Waste Water Pipes, Storage Channels, Shafts For Rain And Waste Water, Rain Retention Rooms With Throttling, Trenches With Storage Functions, Medium-Voltage Lines And Deep Pump Shafts Must Be Installed On The Construction Site. In Particular, The Following Services Are To Be Carried Out: 18,000 M² Construction Road With Subsequent Dismantling; 14,700 M³ Of Excavated Soil; 11,200 M³ Excavation Of Rocky Soil; 17,500 M³ Backfill; 32,000 M² Of Shoring For The Utility Trenches; 9.5 Km Trench Bottom Production; 5.08 Km Of Rain And Wastewater Pipe Laying From Dn 115 - Dn 800 Pp; 1.7 Km Storage Canal; 88 Shafts For Rainwater And Wastewater; 2 Rain Retention Rooms With Throttling; 2 Trenches With Storage Function; 2 Medium Voltage Lines; 2 Deep Pump Shafts. The Services Must Be Carried Out In The Period From May 12, 2026 To January 30, 2029.
Contact Information
Address
Strobelallee 45
Contact No.
+492311204-681
Email
marc.middelmann@westfalenhallen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110037924
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.