|
Landscaping Work – General Renovation Of The Parsberg Grammar School - Landscaping Work For The North Schoolyard. Renovation Area - Conversion, Expansion Of Concrete Pavement, Substructure, Dispose Of, Loosen 750 M² Of Soil, Heap, Dispose Of, Produce 805 M³ Of Pp-Md Drainage Pipes, Earthworks, Create 180 M Of Cable Trenches, Protective Layers, Create 200 M Of Drainage Channels, Facade Gutters, Supply 35 M Of Base Layers Of Covering Surfaces, Install 500 M³ Of Concrete Borders, 480 M Of Edging Produce Flat Steel Strips, Also Radial 250 M Paving Surfaces Produce Concrete Paving 1500 M² Produce Asphalt Pavements 190 M² Equipment Items: Bicycle Racks, Waste Containers, Gratings 20 Pieces Of Prefabricated Concrete Parts, Seating Platforms Produce 4 Pieces Of Garbage Enclosure/Roofing Made Of Steel Construction 1 Piece Of Planting Areas, Plant Delivery, Vegetation Technology, Care 380 M² Of Large Trees Including Completion Maintenance 17 Pieces Of Lawns Incl. Completion Maintenance 650 M² Area Of New Building Loosen Soil, Pile Up, Dispose Of 100 M³ Of Pp-Md Drainage Pipes, Earthworks, 130 M Of Cable Trenches, Protective Layers, 110 M Of Drainage Channels, Facade Gutters, 35 M Of Base Layers, Delivery Of Covering Surfaces, Installation Of 285 M³ Of Concrete Borders, 65 M Of Edging, Of Flat Steel Strips, Also Radial 110 M Of Paving Slabs Produce Concrete Paving 1450 M² Equipment Items: Bicycle Racks, Waste Containers, Gratings 13 Pieces Handrail Made Of Stainless Steel 5 Pieces Prefabricated Concrete Parts, Block Steps Supply 95 M Prefabricated Concrete Parts, Radial Seat Blocks Supply 23 M Prefabricated Concrete Parts, Base Borders Supply 12 Pieces Planting Areas, Plant Delivery, Vegetation Technology, Care 225 M² Large Trees Including Completion Care 3 Pieces
|