Electrical Fitting Work – Lv 4040 - Pv-Anlage. The Subject Of The Contractors Work Is The Manufacture, Delivery And Assembly Of: Construction Of An Extensive Photovoltaic System For The New Building Of The Putzbrunn High School. The Scope Of Services Includes The Delivery And Assembly Of Pv Modules, Several Inverters Of Different Performance Classes, A Battery Storage System (276 Kwh) As Well As The Associated Substructure, Distribution Systems And Protection Technology. This Also Includes The Complete Dc And Ac Cabling, Data And Fiber Optic Connections, Installation Systems On The Roof And In The Building As Well As The Installation Of Sub-Distributions And Network/System Protection Components. Work Is Also Required In The Outbuilding Including The Battery Storage Room, Such As Cable Routes, Installation Devices, Lighting And Potential Equalization. The Course Also Includes Commissioning, Documentation, Instruction, As Well As The Required Crane And Transport Services. The School And Sports Hall Are Positioned In Such A Way That They Form A Spacious Forecourt To The West. The School Yard Area Will Be Created In Addition To The Existing Protected Forest In The South. The Sports Areas Are In The Rear Part Of The Property, To The East Of The Building. The School And Sports Hall Are Positioned In Such A Way That They Form A Spacious Forecourt To The West. The School Yard Area Will Be Created In Addition To The Existing Protected Forest In The South. The Sports Areas Are In The Rear Part Of The Property, To The East Of The Building. The Outline Of The School Building Is Created By Two Bodies That Merge Into One Another. Circumferential Escape Balconies Connect Both Bodies Into One Building. The Larger, Eastern Part Of The School Building Houses Grades 5-10 As Well As Specialist Classes And Has Two Spacious Inner Courtyards With No Basement. The Administration And Teaching Area As Well As Grades 11-13 Can Be Found In The Eastern Part Of The Building. In Addition To The Spacious Foyer, There Is Space On The Ground Floor For The Slightly Lowered Auditorium, Which Is Classified As A Meeting Place. Under The Auditorium Is The Naturally Ventilated Large Garage With 81 Parking Spaces, Which Is Accessed From The West. The School Building Has A Partial Basement To Accommodate The Technical Systems. The Sports Hall Area Is Also Structurally Connected In The Basement. This Part Of The Building Is Partially Lowered And Includes A Separate Entrance Area, A Triple Gym, A Single Gym And A Two-Story Climbing Room. Due To The Lower Interior Height Of The Single Gymnasium, The Roof Area Of The 4Th Part Of The Hall Will Be Expanded Into A Terrace By Adding An Outside Staircase And Made Usable As A Lounge Area And Grandstand. A Pv System Will Be Installed On The Green Roof Areas Of The Triple Gymnasium And The School Building. The School Building Will Be Constructed In The Basement As A Solid Reinforced Concrete Structure And From The Ground Floor In Hybrid Construction, As A Reinforced Concrete Frame Structure, Filled With Solid Wooden Wall Elements. The Ceiling Components Used Are Predominantly Wood-Concrete Composite Ceilings, Consisting Of Stacked Timber Elements And Top-Up Concrete, E.G
Contact Information
Contact No.
089 638 791 35 0
Email
kontakt@szv-m.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 110037619
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.