1. The Subject Of The Order Are Construction Works Entitled: Improvement Of Energy Efficiency Of The John Paul Ii Primary School In Krościenko Wyżny.2. In Order To Implement The Investment Referred To In Point 1, It Is Necessary To Replace The External Window And Door Joinery And To Insulate The External Walls, Foundation Walls And Part Of The Ceiling Under The Unheated, Unusable Attic Of The Existing Building, In Particular: 1) Disassembly And Reassembly Of The Equipment On The Facade With Appropriate Extension Of Cables And Ducts (Lamps, Cameras, Antennas, Sensors, Air Vents, Grilles). 2) Insulation Of The External Walls Of The Plinth (From The Ground Level To A Height Of 1.3 M (Step) In Insulation).3) Modernization Of The Ceiling Partition Under The Unheated Attic Together With A Storage Room.4) Renovation Of The Domestic Hot Water System - According To A Detailed Study Of The Sanitary Industry.5) Insulation Of Foundation Walls In The Ground (Basement Walls).6) Insulation Of External Walls.7) Replacement Of Window Joinery.8) Replacement Of External Door Joinery - Aluminum.9) Installation Of External Blinds With A Controlled Angle Of Inclination. Lamellas (Eastern Facade) - Cassettes Covered In The Insulation Layer, Wired Wall Controller In Each Class Of The Eastern Facade.10) Improving Accessibility (Including The Supply Of Equipment - In Annex No. 1B To Swz, The Item Regarding Equipment Should Be Priced Separately).11) Renovation Of The Lightning Protection System (According To The Electrical Industrys Study).12) Replacement Of Gutters And Downpipes.13) Modernization Of Lighting To Led With The Installation Of Two Passive Energy Compensators (According To The Electrical Industry Study).14) Reconstruction Of External Stairs.15) Renovation And Replacement Of Existing Roofs Over Entrances.16) Replacement Of Sheet Metal Flashings On External Walls And Eaves.3. Requirements For The Works: 1) All Materials Used During The Construction Of The Facility Must Have Appropriate Approvals, Certificates And Technical Approvals. 2) When Selecting The Colors Of Finishing Elements From Different Manufacturers, The Comparison Of Material Samples On The Construction Site Should Be Made Based On Comparison Of Material Samples On The Construction Site, Instead Of Just The Name Or Color Code, In Order To Avoid Differences In Shades Resulting From The Inaccuracy Of Reproducing The Color Pattern. Ultimately, The Colors Will Be Agreed With The Investor During Construction Before The Works Are Performed.3) Mechanical Connectors Intended For Use As Part Of Etics-Type Façade System Solutions, Both Those With A Driven Pin (Metal, Two-Component, Etc.) And With A Screw-In Pin (Metal, Two-Component, Etc.) Are Independent Construction Products And Must Have The Reference Documents Required By Law4) Before Starting The Work, A Thorough Diagnostics To Determine The Type And Technical Condition Of The Partition On Which The Insulation Is To Be Installed.5) Before Insulating The
Contact Information
Address
Gmina Krościenko Wyżne,Krościenko Wyżne,38-422,Podkarpackie,Pl821 - Krośnieński
Email
przetargi@kroscienkowyzne.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109996325
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.