The Scope Of The Order Includes In Particular: 1) Thermal Modernization Of The Buildings Facade, • Thermal Insulation Of The Foundation Walls And Ground Floor With Polystyrene Boards, • Thermal Insulation Of The Buildings External Walls With Polystyrene Boards, • Execution Of A Reinforced Layer And Façade Plaster Made Of Silicone Plaster, • Execution Of Sheet Metal Work And External Window Sills, • Relocation Of Installations On The Facade, • Execution Of Accompanying Works, Including Reconstruction Of The Paving Band Paving.2) Thermal Modernization Of The Roof• Insulating The Roof With Polystyrene,• Making A Roof Covering With Thermally Weldable Felt In Two Layers,• Making Sheet Metal Work On Chimneys And Firewalls,• Making Thermal Insulation Of Chimneys,• Making A New Roof Gutter System.3) Making A Lightning Protection System• Dismantling The Existing Lightning Protection System,• Making A New Lightning Protection System With Grounding,• Taking Measurements Of The Lightning Protection System.4) Replacement Of Windows And Doors• Disassembly Of Existing Window Joinery,• Installation Of New Triple-Glazed Windows With A Heat Transfer Coefficient Uw ≤ 0.9 W/M²k,• Plastering And Painting On The Windows,• Installation Of Internal Granite Window Sills,• Installation Of External Roller Blinds,• Replacement Of External Doors With A Heat Transfer Coefficient Uw ≤ 1.3 W/M²k.5) Modernization Boiler Room• Disassembly Of The Existing Boiler,• Installation Of A New Pellet Boiler,• Installation Of A Buffer Tank,• Implementation Of The Necessary Technological Installations In The Boiler Room.6) Execution Of The Air Conditioning Installation• Delivery And Installation Of A Split Air Conditioner In The Secretariat Room,• Provision Of Electrical Power Supply For The Air Conditioning And Commissioning Of The Installation.7) Modernization Of Lighting• Disassembly Of Existing Lighting Fixtures,• Installation Of New Led Fixtures,• Performance Of The Necessary Plastering And Painting Works,• Measurement Of The Electrical Installation.4. The Detailed Scope Of Works Is Determined By: • Design Documentation, • Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), • Bill Of Quantities, Which Constitute Annexes To This Swz And Are Mutually Complementary. In The Event Of Discrepancies Between The Design Documentation And The Bill Of Quantities, The Provisions Of The Design Documentation And Stwiorb Shall Prevail. The Valuation Should Absolutely Not Be Made Solely On The Basis Of The Bill Of Quantities.5. The Works Must Be Performed In Accordance With Applicable Laws, Principles Of Technical Knowledge And Standards For Construction Works.
Contact Information
Address
Gmina Gostycyn,Gostycyn,89-520,Kujawsko-Pomorskie,Pl618 - Świecki
Email
gostycyn@las.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109996299
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.