|
1. The Subject Of The Order Is The Reconstruction Of A Warehouse Building At Ul. M. Kasprzaka 16, 10-057 Olsztyn For The Needs Of The Warmia-Masuria Voivodeship Office In Olsztyn In The Design And Build System, Including: 1) Development Of Design Documentation Along With Obtaining All Necessary Opinions, Arrangements And Permits, Including Decisions On Building Permits, I.E.: A) Development Of A Construction Design, Executive Designs, Information On Health And Safety, Technical Specifications For The Execution And Acceptance Of Construction Works And Other Studies Necessary To Obtain Formal And Legal Documents Necessary When Issuing A Decision On A Building Permit, Hereinafter Referred To As Design Documentation In The Specification Of The Terms Of The Contract, B) Obtaining A Map For Design Purposes And All Legally Required Conditions, Opinions, Arrangements And Administrative Decisions Necessary For The Contractor To Apply On Behalf Of The Ordering Party To The Competent Authority For Issuing A Decision On A Building Permit Along With Obtaining The Final Decision On The Building Permit On Behalf Of The Ordering Party, C) Carrying Out Authors Supervision By The Authors Of The Construction Design And Detailed Designs During The Execution Of Construction Works, 2) Execution Of Construction Works Based On The Developed Design Documentation, Consisting In The Reconstruction Of The Warehouse Building At Ul. M. Kasprzaka 16, 10-057 Olsztyn For The Needs Of The Warmia-Masuria Voivodeship Office In Olsztyn, Including In Particular: A) Performance Of Demolition And Preparatory Works, Including Disassembly Of The Roof Covering, Dismantling Of Roof Fans, Dismantling Of The Concrete Floor, Dismantling Of Electrical And Telecommunications Installations, B) Performance Of Construction Works, Including The Implementation Of A New Roof Covering Roof, Insulation Of External Walls, Waterproofing Of The Wall, Construction Of A New Industrial Floor, C) Execution Of Joinery Works, Including Replacement Of Two Existing Gates, Partial Bricking Of The Remaining Gate Openings And Installation Of A Steel External Door In One Of Them, Bricking Up Of Window Openings, D) Execution Of Installation Works, Including Construction Of A Gravity Ventilation System With Mechanical Support, Construction Of A New Electrical And Telecommunications Installation, E) Execution Of Internal Finishing Works, Including Cleaning Of Walls And Ceilings, Local Repairs Of Defects And Painting Of Walls,3) Preparation Of Complete As-Built Documentation Necessary For The Contractor To Apply On Behalf Of The Ordering Party To The Competent Authority For Obtaining An Occupancy Permit Decision, Together With Obtaining The Final Occupancy Permit Decision On Behalf Of The Ordering Party.2. A Detailed Description Of The Subject Of The Order Can Be Found In The Functional And Utility Program Constituting Annex No. 6 To Swz.3. If There Is No Obligation To Obtain A Decision On A Building Permit To Perform Co
|