|
The Subject Of The Order Is The Renovation Of 4 School Studios: Graphics And Digital Printing, Organization And Planning In Construction, Tourism And Hotel At The School Complex No. 1. Maria Skłodowska-Curie In Wyszków In The Building Of The Maria Skłodowska-Curie School Complex No. 1 In Wyszków At Ul. Świętojańska 89, 07-200 Wyszków, Consisting Of, Among Others, The Performance Of: I. Construction Works: - Demolition Of Allotment Walls, - Dismantling Floors, - Removing Uneven Concrete, - Removing Demolition Materials, - Performing Leveling Layer For Floors, - Steel Mesh Reinforcement, - Floors, Glazed Aluminum Walls, - Scraping And Washing Old Paint, Wiping Existing Internal Plasters, - Preparation Of Wall And Ceiling Surfaces For Painting, - Surface Finishing - Priming, Double Painting, - Installation Of External Roller Shutters, Ii. Replacing Electrical Installations: - Cutting Grooves For Cables, - Replacing Cables, - Preparing Mortar, - Mortar. Furrows; Iii. Execution Of Internet Installations: - Digging Furrows, - Grouting, - Preparing Mortar, - Grouting Of Furrows); Świętojańska 8. The Ordering Party Informs That The Construction And Renovation Works Are Planned To Be Carried Out During The Summer Break, I.E. In July-August. The Contractor Is Obliged To Carry Out The Works In A Way That Allows The Rooms To Be Made Available In Stages And To Regularly Agree On The Work Schedule With The Ordering Party. In The Event Of Temporary Unavailability Of Some Of The Premises, The Contractor Is Not Entitled To Any Claims For Downtime Works In A Way That Does Not Disrupt The Current Teaching, Educational And Care Activities Of The Facility. Particularly Burdensome Works, Including Those That Generate Noise, Dust Or Require The Temporary Shutdown Of Utilities, May Only Be Performed Outside The Schools Opening Hours, In Particular In The Afternoons, In The Evenings On Days Free From Classes Or On Dates Agreed Each Time With The Ordering Party And Equipment At The Site Of The Works, And After Completion Of The Work, Restoring The Furniture And Equipment And Cleaning The Rooms. The Detailed Scope Of Works Is Specified In The Bill Of Quantities Constituting Annex No. 7 To The Swz. The Subject Of The Order Should Be Performed In Accordance With Applicable Law, Construction Practice, Technical Knowledge, The Contract Concluded With The Ordering Party And The Arrangements Made During The Implementation Of The Subject Of The Contract. The Subject Of The Contract Should Be Performed In Particular In Accordance With The Act Of July 7, 1994 - Construction Law And The Act Of July 19, 2019 On Ensuring Accessibility For People With Special Needs. As Part Of The Implementation Of The Works, The Contractor Undertakes To: 1. Not Create Architectural Barriers In The Scope Of The Order; 2. Maintain The Existing Parameters Of The Accessibility Of Rooms; 3. Use Safe And Anti-Slip Finishing Materials. The Task Is Co-Financed By The European Regional Development Fund Under T
|