The Subject Of The Order Is: Construction Work In The Scope Of: Renovation Of The Roof Covering On Building No. 52 In The Military Complex In Zamość. Case No. Zp/Tp/10/2026. Scope Of Work - Renovation Of The Roof Covering On Building No. 52 In The Military Complex In Zamość Roof Covering - Dismantling Gutters Made Of Unusable Sheet Metal - Dismantling Downpipes Made Of Unusable Sheet Metal - Dismantling Sheet Metal Flashings Of Fire Walls, Eaves, Cornice Collars Etc. Made Of Sheet Metal Unsuitable For Use Dismantling Roof Coverings Made Of Sheet Metal Unsuitable For Use Replacement Of Roof Battens - 30% Of The Surface - 60X60mm Battens Double Fungicidal Impregnation Of Square Timbers By Spraying Method Roof Covering Made Of Flat-Pressed, Ordinary Chipboards With A Thickness Of 16-18 Surface Insulation Membranes, Fastened With Nails Diffusion Layer Under The Sheet Metal Roofing Covering Roofs With An Area Of Over 100 M2 And A Slope Of Up To 85% With Coated Sheet Metal On The Seam. Sheet Metal Flashings Made Of Coated Sheet Metal. Installation Of Semi-Circular Roof Gutters With A Diameter Of 15 Cm From Ready-Made Steel Sheet Elements. Coated - Lying System Gutters Installation Of Round Downpipes With A Diameter Of 10 Cm Made Of Ready-Made Elements Made Of Coated Steel Sheetb) Attic Thermal And Anti-Sound Insulation Made Of Mineral Wool 039, Horizontal, Made Of Dry-Laid Boards - One Layer Thick. 15Cmc) Chimneys Construction Of Scaffolding At The Chimneys Construction Of Horizontal Platforms On The Roof Demolition Of Concrete Chimney Caps Dismantling Of Free-Standing Chimneys - To The Roof Level Rebuilding Of Chimney Ducts - Checking The Ducts Rebuilding Of Chimney Ducts - Clearing Debris From The Ducts - 25% Free-Standing Chimneys Made Of Solid Clinker Bricks - Re-Building Chimneys Chimney Covers With An Average Thickness Of 7 Cm Sheet Metal Flashings Made Of Coated Sheet Metal - Processing Of Covers Fitting Ventilation Grilles In Brick Walls) Accompanying Works Transport Of Rubble From The Demolition Site Transport Of Scrap From The Demolition Site E) Lightning Protection System Untensioned Lightning Protection System Cables Horizontal, Mounted On Brackets - Fezn Wire Fi 8Mm Connecting Lightning Protection System Cables Or Equalizing Cables Made Of A Rod With A Diameter Of Up To 10 Mm On The Roof Untensioned Vertical Lightning Protection Cables Mounted On Shot-In Brackets - Fezn Wire Fi Untensioned Vertical Lightning Protection System Cables Mounted On Shot-In Brackets - Chimneys - Fezn Wire Fi 8Mm Connectors In The Lightning Protection System Or Equalizing Cables Mounted On The Roof Control Connectors In The Lightning Protection System Or Equalizing Cables - Rod-Flat Bar Connection Dismantling And Re-Laying Paving Stones Digging Trenches For Cables With Backhoe Excavators Up To 0.8 M Deep And Bottom Width Up To 0.4 M In Soil Of Categories Iii-Iv Installation Of Horizontal Earthing Electrodes In A Trench Up To 0.8
Contact Information
Address
32 Wojskowy Oddział Gospodarczy W Zamościu,Zamość,22-400,Lubelskie,Pl812 - Chełmsko-Zamojski
Contact No.
261181536
Email
32wog.zampub@ron.mil.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109995925
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.