1. The Subject Of The Order Are Partial Renovations Of Suburban Roads And Sidewalks In The Głogów County.2. Scope Of Works: 1) Partial Renovations Of Bituminous Surfaces With Asphalt Concrete Produced In A Bituminous Mass Plant According To The Scope Specified Below: - Securing And Marking The Work Area, - Cutting Out Damaged Areas Of The Surface And Giving Them Regular Shapes, - Cleaning Damaged Areas And Removing Rubble Into Piles, - Removing Material (Rubble) From The Construction Site For A Distance Of 10 Km, - Filling And Compacting Aggregate Subbase (In Case Of Deep Defects), - Sprinkling With Cationic Emulsion And Spreading The Mineral-Bituminous Mixture In One Or Two Layers Depending On The Depth Of Damage, Maintaining The Road Grade, - Mechanical Compaction Of The Laid Mixture, - Sprinkling The Repaired Area And Smearing The Repaired Edge With Heated Bitumen Or Asphalt Emulsion Along With Sweeping The Above-Mentioned Places.2) Renovation Of The Surface Made Of Concrete Cubes, Granite Cubes (Recycled Material). Dismantling The Surface, Laying Concrete Or Granite Cubes On A Sand Bed (Or Basalt Aggregate) Thickness. 3 Cm After Compaction, Transport Of Rubble And Storage (In The Case Of Pavement Renovation With Material) For A Distance Of Up To 10 Km; 4) Setting A New Curb: Digging A Trench For The Curb, Setting The Curb With The Construction Of A Concrete Footing With A Stop 5) Dismantling The 15X30 Or 20X30 Curb: Dismantling The Curb Concrete Footing 15X30 Or 20X30, - Dismantling The Footing For The Curb, - Removing Rubble Up To 10 Km Away, Including Storage Costs. Resistance7) Dismantling Of 6X30 Or 8X30 Sidewalk Edges: - Dismantling Of 6X30 Or 8X30 Edges, - Removal Of Rubble Up To 10 Km, Including Storage Costs Manholes, - Removing The Sewage Grate Or Other Covering, - Dismantling The Upper Part Of The Manhole, - Removing The Surface And Substructure Around The Device, - Collecting And Throwing Away The Rubble On The Road, - Making Formwork, - Laying And Compacting Concrete, Or Laying Road Clinker On The Mortar, - Dismantling The Formwork, - Placing The Sewage Grate Or Other Covering On The Cement Mortar. Along With Its Preparation. 10) Filling The Gaps In The Road With Poured Asphalt Or Cold Mass Using The Irr Method - Cleaning The Gap From Any Loose Residues - Filling The Gap With Crushed Stone And Compacting It To A Level Of - 2 Cm Below The Road Level - Spreading The Poured Asphalt Or Cold Mass In The Place Of Damage To The Thickness. 2.5 Cm - Leveling And Compaction Of The Material Placed, Leaving An Excess Of 0.5 Cm Above The Ground Surface11) Cutting Of Roadsides - Mechanical Cutting Of Roadsides - Removal Over A Distance Of 10 Km With Disposal - Loading And Disposal Of Excavated Material To A Landfill - Mechanical Sweeping Of The Road After Cutting Roads 12) Profiling And Regulation Of Ditches Roadside - Mechanical Profiling And Cutting Of Ditch Slopes - Mechanical Deepening Of Ditch Bottoms - Removal Of Excavated Material Over
Contact Information
Address
Powiat Głogowski,Głogów,67-200,Dolnośląskie,Pl516 - Legnicko-Głogowski
Email
rz@powiat.glogow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109995921
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.