1. The Subject Of The Order Is The Construction Of A Warehouse Building For Civil Defense And Civil Protection On Plot No. 520/14 In Siedliska-Bogusz. 2. Investment Location - Plot No. 520/14, Precinct 15, Siedliska-Bogusz, Brzostek Commune.3. Subject Of The Order. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Construction Of A Warehouse Building For Civil Defense And Civil Protection With A Full Range Of Internal And External Installations, A Septic Tank For Liquid Waste With A Capacity Of 5.0 M³, A Photovoltaic Installation And The Necessary Technical Infrastructure.4. Detailed Scope Of Works4.1 Preparatory Works• Taking Over And Securing The Construction Site,• Geodetic Marking Out Of The Facility,• Organization Of Construction Facilities,• Construction Of Fencing And Marking The Area,• Preparation Of The Area For Earthworks.• All Arrangements And Opinions Necessary To Complete The Task. The Ordering Party Will Grant A Power Of Attorney. 4.2 Earthworks• Excavations For Foundations,• Excavations For External Installations,• Construction Of Ballasts And Backfills,• Soil Compaction,• Removal Of Excess Soil.4.3 Foundations And Structure• Execution Of Base Layers And Lean Concrete,• Construction Of Footings And Foundation Walls,• Execution Of Damp-Proof And Waterproof Insulation,• Construction Of Reinforced Concrete Elements: Walls, Columns, Beams, Rings, Ceilings,• Construction Of Steel Elements: Roof Purlins, Columns, Transoms,• Construction Of A Roof Structure From Board Girders,• Construction Of Roof Covering - Colors And Shape Agreed With The Ordering Party, • Execution Of Sheet Metal Flashings And Gutters.4.4 Walls, Partitions And Façade• Construction Of Brick Walls And Partitions,• Execution Of Internal Plasters,• Cladding Of Walls With Tiles Along With Moisture-Proof Insulation And Corner Tapes, • Execution Of Suspended Ceilings And Plasterboard Structures, • Execution Of Painting Works - Agree The Color With The Ordering Party At The Execution Stage. • Insulating The External Walls And The Façade, With The Inscription Magazyn Ochrony Łpopności I Obrony Civilej (Magazyn Ochrony Łudności I Obrony Ciwilnej) Inscription. • External And Internal Joinery And Joinery. • Industrial Garage Doors, Automatic And Mechanical Drive With Chains, Along With Traffic Lights On The External And Internal Walls, Ral 3000 Color, 2 Glazed Panels, 4.5 Floors And Tiles • Flooring On The Ground, • Installation Of Sub-Floor Layers, • Installation Of Mechanical Floors, Troweled Smooth To Enable Keeping Them Clean, With A Reinforced Structure For Trucks, Axle Load Of Approximately 10-15 Tons. • Installation Of Ceramic Cladding In Sanitary Areas And Dry Rooms.5. Sanitary Installationsthe Scope Includes The Implementation Of Complete Installations:• Internal Water Supply System, • Internal Sanitary Sewage System, • External Water Supply System With A Well, • Sanitary Sewage System To A Septic Tank With A Capacity Of 5.0 M³, • Central
|