Quotation are invited for BPST7 Jacking Oil Pump Discharge Pipeline Fabrication. SCOPE OF WORKFABRICATION AND SUPPLY OF TWO (02) SETS OF PIPELINESFOR BPST7 JACKING OIL PUMP # DISCHARGE PIPELINE1. SITE SURVEY AND S AMPLE COLLECTION1.1 VENDOR SHALL COLLECT EXISTING PIPELINE SAMPLES FROM E-STATION BPST7STEAM TURBINE.1.2 SCOPE INCLUDES SAFE REMOVAL AND RE-INSTALLATION OF THE EXISTINGSAMPLE PIPELINE AFTER MEASUREMENT AND INSPECTION.2. MEASUREMENT AND ENGINEERING2.1 COMPLETE MEAS UREMENT OF THE EXISTING DISCHARGE PIPELINE, INCLUDINGLENGTHS, ROUTING, FITTINGS, BENDS, AND CONNECTIONS.2.2 REPLICATION OF THE PIPEL INE STRICTLY AS PER EXISTING SAMPLE,MAINTAINING SAME DIMENSIONS, ORIENTATION, AND MATERIAL SPECIFICATION.2.3 ALL FITTINGS TO BE SUIT ABLE FOR HIGH-PRESSURE OIL APPLICATION.3. DESIGN CONDITIONS3.1 WORKING PRESSURE: 250 BAR3.2 DESIGN PRESSURE: 350 BAR3.3 OPERATING TE MPERATURE: 100°C4. MATERIAL SPECIFICATION4.1 ALL MATERIALS SHALL BE IN THE VENDOR#S SCOPE OF SUPPLY.4.2 PIPELINE MATERIAL: SS-316, S IZE: 25 MM.4.3 ALL FITTINGS SHALL BE DOUBLE FERRULE TYPE AND PARKER MAKE ONLY.4.4 MATERIALS SHALL BE SUITABLE FOR HIGH-PRESSURE JACK ING OIL SERVICE.5. FABRICATION AND SUPPLY5.1 FABRICATION OF TWO (02) COMPLETE SETS OF DISCHARGE PIPELINES.5.2 SUPPLY OF ALL REQUIRED PIPES, FITTINGS, CONNECTORS, CLAMPS, ANDACCESSORIES NECESSARY FOR COMPLETE INSTALLATION.5.3 WORKMANSHIP SHALL COMPLY WITH GOOD ENGI NEERING AND INDUSTRYPRACTICES.6. NON-RETURN VALVE (NRV) SUPPLY6.1 VENDOR SHALL SUPPLY TWO (02) NUMBERS OF DISCHARGE NRVS, PARKER MAK EONLY, STRICTLY AS PER APPROVED SAMPLE.6.2 NRVS SHALL BE SUPPLIED WITH MATERIAL TEST CERTIFICATE (MTC) ANDPRESSURE TEST CERTIFICATE. 7. TESTING AND QUALITY ASSURANCE (ADDED)7.1 ALL FABRICATED PIPELINES SHALL UNDERGO HYDROSTATIC / PRESSURETESTING AT APPROPRIATE TEST PRESSURE AS PER APPLICABLE STANDARDS.7.2 TEST REPORTS AND QUALITY DOCUMENTS SHALL BE SUBMITTED ALONG WITH THEMATERIAL.8. DOCUMENTAT ION (ADDED)8.1 SUBMISSION OF THE FOLLOWING DOCUMENTS IS MANDATORY:·#MATERIAL TEST CERTIFICATES (MTC)·#PRESSURE / HYDRO TEST CERTIFIC ATES·#WARRANTY CERTIFICATE9. WARRANTY9.1 VENDOR SHALL PROVIDE A MINIMUM ONE (01) YEAR WARRANTY FOR ALLSUPPLIED MATERIALS AND WORKMAN SHIP FROM THE DATE OF COMMISSIONING ORSUPPLY.10. EXCLUSIONS (OPTIONAL # BUT RECOMMENDED)10.1 ANY CIVIL WORK, STRUCTURAL MODIFICATION , OR CHANGES IN EXISTINGSYSTEM LAYOUT ARE EXCLUDED UNLESS SPECIFICALLY MENTIONED.10.2 POWER SUPPLY, SCAFFOLDING, OR SPECIAL LIFTING ARRANGEMENTS (IFREQUIRED) ARE EXCLUDED UNLESS STATED OTHERWISE. Qty: 2 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412600417)/$value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109990867
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.