Architectural, Construction, Engineering And Inspection Services – Lühesperrwerk Planung. According To Hoai 2021, The Following Services Must Be Provided: According To Part 3 Object Planning In Section 3: Engineering Structures In Performance Phases 1 To 9 For Engineering Structure 1 = Barrier Engineering Structure 2 = Dike Engineering Structure 3 = Bridge, If Applicable, Engineering Structure 4 = If Necessary, Pumping Station According To Part 4 Specialist Planning In Section 1: Structural Planning In Performance Phases 1 To 6 For Engineering Structure 1 = Barrier Engineering Structure 3 = If Necessary, Bridge, Engineering Structure 4 = If Necessary, Pumping Station According To Part 4 Specialist Planning In Section 2: Technical Equipment In The Service Phases 1 To 9, System Groups 1 To 5 And 8 For Engineering Structure 1 = Barrage, Engineering Structure 3 = If Necessary, Bridge, Engineering Structure 4 = If Necessary, Pumping Station. It Can Currently Be Assumed That At Least The Service Phases 1 To 6 Of The Object Planning For The Engineering Structure And Structural Planning As Well As The Service Phases 1 To 9 For The Performance Profile Technical Equipment Should Be Planned By Third Parties. After The Contract Has Been Concluded, The Construction Of The Next Service Phase Is Carried Out In Stages (Service Phases). The Contractor Is Commissioned Separately In Writing For Each Service Phase. The Contractor Is Not Entitled To Conclude Further Contracts After The End Of A Service Phase For The Following Service Phase. The Following Three Services Must Be Provided As Special Services: A Preliminary Investigation - Planning Of The Lühesperrwerk Preliminary Consideration - From December 18Th, 2025 Must Be Checked, Adjusted, Updated And Finally Completed. In Order To Obtain A Better Starting Point For Fundamental Planning Decisions In Advance Of The Actual Planning, It Was Examined In 2025 Whether An Increase And Reinforcement Of The Existing Barrier Could Be Implemented With Significant Use Of The Existing Building Structure. In Connection With Service Phase 1 Of The Object Planning Of Engineering Structures, A Verification Of The Preliminary Site Investigation Carried Out By The Client With Determination Of The Final Location Must Be Carried Out As A Special Service In Service Phase 2 At The Latest. Sustainability Studies And Assessments As Well As Life Cycle Assessments (Life Cycle Assessment (Lca) Or Life Cycle Analysis) Must Be Carried Out. For This Purpose, A Sensible And Suitable Concept For This Coastal Protection Measure Must Be Drawn Up And Agreed With The Client.
Contact Information
Address
Harsefelder Strasse 2
Contact No.
+49 4141 601 0
Email
poststelle.std@nlwkn.niedersachsen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109971100
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.