|
Works For Complete Or Part Construction And Civil Engineering Work – Construction Of A Sanitary Sewage System With Connections In The Streets Of Al. Sportsmen, Czeladz, Barbara, Śląsk (Formerly Świerczewski), John Paul Ii, Parkowo, Bocianów, Śmiłowski, Mickiewicza, Boczna, Poprzeczna, Myśliwiecka, Pszczelnicza In Siemianowice Śląskie. 1. The Subject Of The Order Is The Construction Of A Sanitary Sewage System With Connections In The Streets Of Al. Sportsmen, Czeladz, Barbara, Śląsk (Formerly Świerczewski), John Paul Ii, Parkowo, Bocianów, Śmiłowski, Mickiewicz, Boczna, Poprzeczna, Myśliwiecka, Pszczelnicza In Siemianowice Śląskie. 2. The Subject Of The Order Includes The Construction Of A Sanitary Sewage System With Connections In The Streets Of Al. Sportsmen, Czeladz, Barbara, Śląsk (Formerly Świerczewski), Jana Pawła Ii, Parkowo, Bocianów, Śmiłowskiego, Mickiewicza, Boczna, Poprzeczna, Myśliwiecka, Pszczelnicza In Siemianowice Śląskie With A Total Length Of 7,311.5 M. The List Of Lengths Divided Into Diameters Is Presented In Appendix No. 6 To The Swz. 3. A Detailed Description Of The Subject Of The Order Is: A) Design Documentation (Appendix No. 3 To The Swz), B) Technical Specifications For The Execution And Acceptance Of Construction Works (Appendix No. 4 To The Swz), C) Bills Of Quantities (Appendix No. 5 To The Swz), D) List Of Lengths Divided Into Diameters (Appendix No. 6 To The Swz), E) Material Scope Marked On The Maps (Appendix No. 7 To The Swz), F) Designed Provisions Of The Contract (Supplement No. 8 To Swz), - Hereinafter Collectively Referred To As Documentation. The Documentation Is Available At: Https://Josephine.Proebiz.Com/Pl/Tender/74878/Summary. Note: Due To The Fact That The Basis For Settling The Works With The Contractor Will Be A Lump-Sum Remuneration, The Bill Of Quantities Is Not The Basis For Preparing A Valuation By The Contractor, But Is Only Of Auxiliary And Informative Nature, And The Work Quantities Adopted Therein Are Indicative. The Statements Included In The Bill Of Quantities Are Intended To Illustrate The Scale Of Construction Works, Although The Bill Of Quantities Itself Does Not Determine The Contractors Obligation, Which Is The Full Design Documentation; The Bill Of Quantities Is Intended To Help The Contractor Estimate The Investment Costs. The Valuation Basis (Knr) Is Given For Information In The Attached Bill Of Quantities. A Bid Cost Should Not Be Submitted. The Order Is Financed By The Polish-Swiss Urban Development Program (As Part Of The Second Edition Of Swiss Financial Assistance For Selected European Union Member States In Order To Reduce Socio-Economic Differences Within The European Union).
|