Metalworking – Baroque Wing Of Geyerswörth Castle - Metal Construction And Locksmith Work. Metal Construction And Locksmith Work The Side Surfaces Of The Newly Built Staircase In The Central Building Of The Baroque Wing As Well As The End Of The Reinforced Concrete Ceiling In The Same Room Will Be Clad With Metal Stringers And Provided With Steel Bar Railings, And The Full Length Of The Staircase Will Have Handrails With A Steel Core On Both Sides. Likewise, A Railing Will Be Installed In The Auditorium Of The Puppet Theater To Protect The North-Side Fall Protection Of The Spectator Stand In The Same Way As The Stair Railings Mentioned Above. Furthermore, Metal Construction Structures Will Be Used In Several Places In The Newly Built Connecting Building To The Core Castle, Including Two Steel Frame Windows In The West And East Facades Of The Building And A Connecting Bridge On The Upper Floor To Be Built As A Steel Structure. Finally, Fire Protection Doors Are Primarily Installed In The Hallways On All Floors Of The Building As Steel Doors With Glass Inserts.
Contact Information
Address
Untere Sandstraße 34
Contact No.
+49 951871697
Email
vergabestelle@Stadt.Bamberg.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109921435
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.