|
Construction Work – Borsócséplő Water Plant And Water Base Development. The Development Needs For The Supply Area Of The Borsócséplő Water Plant Exceed The Capacity Of The Existing Water Base (Borsócséplő Wells). It Is Necessary To Expand The Capacity Of The Wells Of The Borsócséplő Water Base. It Is Advisable To Expand The Capacity Of The Water Base From The Water Base No. I Of The City Of Paks, Which Is Currently Registered As A Reserve Water Base, Which Is Located At Waterworks No. I (Paks 3590 Hrs.) Next To The Main Road No. 6. The Wells Of The Paks City Water Plant No. 1, The Water Base, Are Currently Out Of Service. The Ii. No. (Pea Miller) Water Plant (Paks 3588 Hrs.) Is Not Currently In Operation Either, Only In Recent Years The Sprinkler Water Network Of The Paks Industrial Park Has Been Fed During The Growing Season Through The Water Pipeline Built From The Water Plant To Ii/3. With Untreated Quality Water Extracted From Well No. The Ii. No. (Pea Thresher) Waterworks And I. The Water Treatment Plants Cleaning Technology Is Not Suitable For Complying With The Limit Values Prescribed By The Current Legislation, And The State Of The Existing Reservoirs Does Not Allow For The Renovation Of The Existing Facilities. The Following Developments Will Be Implemented In Relation To The Borsócséplő Water Plant And Water Base: I. And Ii. No. Water Plants, The Existing Facilities Must Be Dismantled According To The Technical Documentation. At Waterworks No. I, The Existing Wells I/1, I/2, I/3 Must Be Blocked And The Connecting Pipes Of The Wells Need To Be Dismantled, Ii. (Borsócséplő) Water Plant (Paks 3588 Hrsz.) Existing Buildings And Facilities (Existing Buildings, Artefacts And, Together With Them, Distribution And Aluminum Enclosures) Will Be Demolished. I. And Ii. No. 12, The Currently Existing Wells (3 Each) Must Be Renovated With Additional Drilling, And The Capacity Of The Water Bases Can Be Taken Into Account With The Capacity At The Time Of The Original Drilling. The Existing Water Wells Must Be Filled Up (3 Each). The Purpose Of The Well Renovation Is To Increase The Operational Safety Of The Drinking Water Supply In The I. And Ii. By Renovating The Waterworks Wells Of Waterworks No. The Ii. No. (Borsócséplő) Water Plant, Depth Of Wells: K-75/A: 135 M, K-63/A: 218 M, K-76/A: 100 M. Expected Yield From The New Wells: K-75/A: 1000 L/D I.E. 60 M3/H, 1200 M3/D Based On 20-Hour Operation. K-63/A: 300 L/P, I.E. 18 M3/H, 360 M3/D Based On 20-Hour Operation. K-76/A: 600 L/P, I.E. 36 M3/H, 720 M3/D With 20-Hour Operation. The Depth Of The Wells Planned At No. I (Borsócséplő) Water Plant: K-9/A: 135 M, K-51/A: 90 M, K-66/A: 225 M. Expected Yield From The New Wells: K-9/A: 450 L/D, I.E. 27 M3/H, 540 M3/D Based On 20-Hour Operation. K-51/A: 300 L/P, I.E. 18 M3/H, 360 M3/D Based On 20-Hour Operation. K-66/A: 650 L/P, I.E. 39 M3/H, 780 M3/D Based On 20-Hour Operation. Development Of A Pipeline And Water Supply Network Between Two Water Plants: With The Development Of The Borsócséplő Water Plant, The Treatment Of Extracted Raw Water From Water Plant No. I Can Also Be Ensured
|