Common Procurement Vocabulary: Cpv 45230000-8 Construction Works For The Construction Of Pipelines, Communication And Power Lines, Highways, Roads, Airports And Railways; Land Levelingcpv 45233142-6 Road Repair Worksorder: Kruszwica Commune Completion Date: 8 Weeks From The Date Of Conclusion Of The Contract1. Subject Of The Order: The Subject Of The Order Is The Performance Of Partial Renovations Of Municipal Roads Located In The Kruszwica Commune With Bituminous Surfaces And Made Using The Surface Consolidation Method With Asphalt Emulsion And Grit. The Order For The Renovation Of Municipal Roads Made Using The Method Of Surface Consolidation With Asphalt Emulsion And Grit Includes: • Filling Holes Up To 2 Cm Deep With Asphalt Emulsion And Grit Using A Renovator • Filling Holes Up To 4 Cm Deep With Asphalt Emulsion And Grit Using A Renovator • Eliminating Cracks And Cracks With Asphalt Emulsion And Grit Using A Renovator Scope Of Work Related To Filling Defects, Potholes, Broken Edges And Eliminating Cracks And Burrs With Asphalt Grits And Emulsion Using A Renovator, Includes: • Preparing The Damaged Area For Repairs • Covering The Cleaned Area By Spraying With Asphalt Emulsion, The Task Of Which Will Be To Bind The Substrate And The Edges Of The Repaired Pavement Defect With The Filling • Filling The Defect With 5/8 Mm Or 2/5 Mm Grit Under Pressure (Depending On The Depth Of The Defect) Surrounded By Asphalt Emulsion• Filling The Remaining Part Of The Defect Under Pressure With 2/5 Mm Fraction Grit (If Used For The Bottom Layer Of 5/8 Mm Grit) Covered With Asphalt Emulsion• Sprinkling The Surface Of The Renovated Area With Dry 2/5 Mm Grit Without Binder• Cleaning Up The Site After The Renovation• Removing Safety Devices And Vertical Markings And Making The Site Available The Renovated Section Is Open To Traffic. The Ordering Party Does Not Allow Renovations To Be Carried Out Using A Sprinkler Or Manual Scattering Of Grit. The Order For The Renovation Of Municipal Roads With A Bituminous Surface With A Hot Mineral-Bituminous Mixture Includes: • Installation Of 200 Mg Of Mmb Hot. The Scope Of Works Related To Filling The Defect, Pothole, Broken Edges With A Hot Mineral-Bituminous Mixture Includes: • Preparation Of The Damaged Area For Repairs • Cutting Out The Damaged Places Surface With Regular Shapes• Cleaning Of Damaged Places With Removal And Disposal Of Excavated Material• Supplementing The Base With Mechanically Stabilized Crushed Aggregate 0/31.5Mm To The Height Of The Lower Bituminous Surface• Sprinkling The Repaired Area With C60b3zm Asphalt Emulsion In The Amount Of 0.5 Kg/M2. • Spreading The Mineral And Bituminous Mixture With A Grain Size Of 0/8 Mm (Ac8 S 50/70) And 0/11 Mm (Ac11 S 50/70) For Kr 2, Laid Manually Or Mechanically Using Pavers And Steel Rollers Or Compactors In One Or Two Layers Depending On The Depth Of Damage • Compaction Of Individual Layers Of The Mixture • Cleaning Up The Area After Renovation • Photo Of The Equipm
Contact Information
Address
Gmina Kruszwica,Kruszwica,88-150,Kujawsko-Pomorskie,Pl617 - Inowrocławski
Contact No.
523515010
Email
um@kruszwica.um.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109913630
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.