|
The Subject Of The Order Is To Provide Investor Supervision For Three Industries (Construction, Sanitary And Electrical) As Part Of Construction Works Including The Expansion Of The Primary School Building Together With Kindergarten Classes And Accompanying Infrastructure In Ciełądz, Including The Demolition Of The Old Part Of The Kindergarten Building. The Investment Area Is Located On The Plot No. 193/1 In Ciełądz, Commune. Ciełądz, Rawa County In The Łódź Voivodeship (Plot Id 101303_2.0003.193/1) - Area Of The Existing School. Currently, The School Building Has An Old Wing That Is Scheduled For Demolition And Currently Houses Kindergarten Classes, A Kitchen And A Canteen. The Investment In Question Involves The Demolition Of This Part Of The Building And Then The Expansion Of The School By Building A Two-Story Wing Along With New Development Of The Area Around The School (Reconstruction And Construction Of The Road System, Construction Of A Communication System And Elements Of Small Architecture, Reconstruction Of The Biologically Active Surface). The Scope Of Construction Works To Be Carried Out Includes: 1. Demolition Of The Existing Kindergarten Wing In Two Stages. 2. Construction Of A Two-Story School Wing Connected To The Existing Building, Including: Kindergarten Departments, Teaching Rooms, Social Rooms, Sanitary Rooms, Technical Rooms, Kitchen And Canteen, Elevators.3. Execution Of Works In The Electrical Industry - Installations In The Building, Reconstruction Of The Existing Wlz Power Supply System And Sports Field Lighting, Construction Of A Photovoltaic Installation With Documentation (Photovoltaic Panels On The Roof Of The Building), Electrical Switchboards, Telecommunications And Alarm Installations.4. Execution Of Works In The Sanitary Industry - Sanitary Installations In The Building, Construction Of A New Water Supply Connection, Construction Of Internal Mechanical Ventilation, Construction Of A Gas Installation To Power The Kitchen, Construction Of A Heating Installation, Construction Of A Storm Sewage System For External Tanks, Technological Sewage System For The Kitchen.5. Implementation Of New Land Development, Development Of The Area Around The School - Parking Lots, Sidewalks, Driveways, Small Architectural Features. The Ordering Party Has Design Documentation Along With A Building Permit And A Demolition Permit. Key Parameters Of The Designed Building: Building Volume: 9,413.30 M3 Building Area: 1,122.00 M2 Total Area: 2,221.20 M2 Usable Area: 1,934 M2 The Scope Of Work For Ini From The Construction And Construction Industry Includes Supervision Of The Following Scopes Of Work: 1. Demolition Of The Existing Kindergarten.2. Designed Expansion Of The School Building.3. Sanitary Industry Works (Coordination With The Sanitary Industry Inspector).4. Electrical Industry Works (Coordination With The Electrical Industry Inspector).5. Construction Works In The Existing School Building.6. Development Of The Plot.7. Security Of
|