The Subject Of The Order Is: Reconstruction Of District Road No. P1 566 R Ul. Czarnieckiego In Sieniawa At Km 0+005 - Km 0+305. The Scope Of The Subject Of The Order Includes: Road Industry1. Preparatory Works:• Measurement Works For Linear Road Works, Road Routes In Hilly Terrain• Preparation Of An As-Built Geodetic Report And Submission To The Investor In Paper And Electronic Versions, The Electronic Version Should Also Contain Files In An Editable Version - By Analogy• Dismantling Of Pavement Surfaces Made Of Paving Stones Together With Edges - By Analogy - Edges Disposal, Paving Stones For Re-Installation• Dismantling Of The Trilined Surface, Mechanical Demolition With Disposal• Dismantling Of The Sub-Base Of Aggregate, Mechanically - With Disposal• Dismantling Of End Walls - By Analogy, With Disposal• Dismantling Of The Culvert Under The Road Crown At Km 0+018.7, 3X800 - With Disposal, By Analogy• Dismantling Of The Sub-Base 15-20 Cm Thick, Of Aggregate, Mechanically With Transport To The Storage Site - Aggregate For Re-Installation - By Analogy• Dismantling Of Concrete Curbs On A Concrete Footing - Demolition With Disposal• Steel Road Barriers - Dismantling And Transport In The Town Indicated By The Investor• Vertical Adjustment Of Manholes For Underground Facilities, Water Supply Valves• Manual Linear Excavations, Soil Category I-Ii• Two-Part Protective Pipes F110• Two-Part Protective Pipes F160• Manual Backfilling Of Excavations With Compaction, Soil Category I-Ii2. Technological Channel:• Construction Of Prefabricated Distribution And Main Cable Wells, Skr-2 Heavy Type• Construction Of Prefabricated Distribution And Main Cable Wells, Skr-2, By Analogy• Construction Of Culverts Under Terrain Obstacles Using The Controlled Flushing And Drilling Method. Ktp Cable Ducting - Made Of Thick-Walled Rhdpep Pipes. 2X Hdpe Pipes. 1Xfi 110Mm, 1Xfi125mm + Warning Tape 25Cm Wide With Steel Insert. Culvert Up To 100 M, - By Analogy• Pulling In Secondary Sewage Pipes With Mechanical Equipment, Free Hole, Pipes In Coils, 3Xfi 40 Mm• Pulling In Secondary Sewage Pipes With Mechanical Equipment, Hole Partially Occupied, Pipes In Coils, 1X Mikrorur Bundle (7 Pcs. In A Bundle) In A Rhdpewp 40/3.7 Mm Casing Pipe• Installation Joints Of Polyethylene Pipes In The Sewage System, Hdpe Pipes Fi 40 Mm, Screwed Connectors3. Earthworks:• Earthworks Performed With Backhoe Excavators, With Transport Of Excavated Material By Self-Unloading Vehicles And Disposal, Excavator 0.40 M3, Soil Category I-Ii• Earthworks Performed With Backhoe Excavators, With Transport Of Excavated Material By Vehicles Within The Construction Site, Excavator 0.40 M3, Soil Category I-Ii• Excavations And Cuttings With Installation In Embankment With Backhoes, Excavator 0.25-0.60, Soil Category I-Ii• Excavations With Manual Loading, Transport And Disposal, Soil Category Ii - By Analogy• Manual Excavations With Embedding In The Embankment, Soil Category I-Ii• Supply Of Gravel - By Analogy• Manual For
|