|
1. The Subject Of The Order Is The Development Of Design Documentation And Construction Of A Parking Lot At The Technical School Complex, Ul. Stołeczna 21 In Białystok.2. The Subject Of The Order Includes: 1) Development Of Design Documentation In Accordance With The Functional And Utility Program And The Land Development Concept - Variant W-3, Which Should Include: A) The Investors Written Acceptance, Prior To The Execution Of The Works, In Terms Of Compliance With The Functional And Utility Program, B) Construction Design (5 Copies), C) Executive Designs (3 Copies, Each Industry And Installation Separately), D) Detailed Bill Of Quantities (1 Copy, Separately). Each Industry And Installation), E) Simplified Cost Estimate (1 Copy, Each Industry And Installation Separately), F) Technical Specifications For The Execution And Acceptance Of Works (1 Copy, Each Industry And Installation Separately), G) Electronic Version Of The Study In Pdf* Format, And The Bill Of Quantities And Cost Estimate In Excel*, Pdf* And Ath* Format, (1 Copy), H) Inventory Of Greenery Colliding With The Investment (3 Copies) (If Cutting Is Necessary, Taking Into Account All Works Related To Felling, Grubbing And Removal As Well As A Design Of Replacement Plantings),2) Obtaining All Necessary Materials To Complete The Subject Of The Order (E.G. Current Geodetic Map, Geotechnical Documentation, Decisions, Technical Conditions For Connection, Conditions For Securing Or Rebuilding Elements Of Technical Infrastructure Colliding With The Investment (If Necessary, Developing Appropriate Design Documentation In This Regard And Performing The Necessary Construction Works), Opinions, Arrangements Required By Law,3) Submitting An Application And Obtaining A Notification Or Permit Water And Legal Regulations,4) Submitting An Application To The Department Of Architecture Of The Municipal Office In Białystok And Obtaining A Decision On A Building Permit,5) Ensuring Authors Supervision During The Implementation Of Construction Works,6) Carrying Out All Construction Works Based On The Developed And Approved Design Documentation Along With: A) Full Surveying Services (Including A Post-Inventory Map In 5 Copies With The Dimensions Of Land Development Facilities And Devices And Technical Infrastructure), B) Organization And Securing The Construction Site With Ensuring Continuous Access To The Facility During Its Duration, C) Payment Of Compensation For Any Damage That Occurred As A Result Of The Execution Of The Subject Of The Contract, D) Carrying Out The Required Tests, E) Activities And Preparation Of Documents Necessary For The Final Acceptance Of The Investment And Putting The Facility Into Use, Including: - An Inspection Report, Including: A Set Of Approvals And Certificates For The Built-In Materials, A Statement From The Construction Manager, Replacement Documentation, All Test And Inspection Protocols Signed By The Construction Manager And The Supervision Inspector Investor (Soil Compa
|