During The Formation Of A Large Amount Of Algae Along The Course Of The Danube River, A Significant Part Of This Algae Accumulates In The Underflow Channels Of Bps 1 And Bps 2,3 On Their Coarse Grids. In Order To Ensure A Smaller Flow Of Algae, It Is Necessary To Block Their Path To The Beginning Of The Underflow Channels Of Bps 1 And Bps 2,3. This Can Be Done By Installing A Floating Barrier System Made Of Steel Pontoons. The Subject Of The Order Is The Manufacture And Delivery Of 20 Steel Pontoons To Protect Against Algae. The Production Must Be Carried Out According To The Requirements Of Technical Assignment No. 23.Bps.Tz.68 And Appendix 1 To It - 3 Drawings.
Contact Information
Contact Person
Станислава Богоева
Contact No.
+35997374184
Email
SLBogoeva@npp.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109874752
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.