1. The Subject Of The Investment Is The Thermal Modernization Of The Building Of The Village Community Center In Ostrów In The Dąbrowa Białostocka Commune, On Plots With Geod. 90/2 And 90/4, Precinct 0026 Ostrowie.2. The Subject Of The Order Includes The Expansion, Reconstruction And Thermal Modernization Of The Building Of The Village Community Center In Ostrów In The Scope Of: - Demolition And Preparatory Works, - Insulation Of External Walls, - Insulation Of Foundation Walls, - Insulation Of The Ceiling Above The Utility Rooms In The Attic Space, - Insulation Of The Floor, - Implementation Of Moisture-Proof Insulation In The Foundation Walls, - Raising The Roof Over The Entrance (Building Up The Wall, Execution Reinforced Concrete Ring), - Construction Of Partition Walls, - Widening Of Door Openings, - Replacement Of Window And Door Frames - Demolition Of Existing External Stairs And Construction Of New External Stairs, - Construction Of A Septic Tank For Liquid Waste (Sanitary Sewage) With A Capacity Of 9.8 M3 Along With An Underground External Sanitary Sewage System, - Construction Of A Water Supply Connection And An Above-Ground External Hydrant, - Construction Of A Central Heating Installation - Assembly Heat Pumps, - Installation Of Water And Sewage Systems Inside The Building, - Development Of The Area - Installation Of Hardened Surfaces, - Installation Of Electrical Installations In The Building, - Installation Of A Lightning Protection System, - Installation Of A Photovoltaic Installation, - Modernization Of The Lighting Installation In Terms Of Replacing Lighting Fixtures, - Delivery And Installation Of A Rainwater Tank, - Planting Fruit Trees (Including A Paradise Apple Tree 5 Pcs.) - 10 Pcs. In Addition, In Accordance With The Resolution Biebrza National Park No. Pp101/2023 Of September 7, 2023, Agreeing On The Draft Decision On Development Conditions, The Building Of The Community Center Is A Potential Habitat For Bats (I.E. The Common Bat And The Common Bat) Which Are Subject To Species Protection, Therefore, Before Starting Work, The Modernized Building Should Be Inspected For The Presence Of Bats. If They Are Found, A Consultation With A Chiropterology Expert Should Be Carried Out, Who Will Determine Individual Protective Recommendations. If It Is Necessary To Physically Disturb The Breeding, Wintering Or Colony Of Bats, It Is Necessary To Obtain A Permit To Derogate From The Prohibitions Applicable To Protected Species. A Detailed Description Of The Subject Of The Order And The Method Of Its Implementation Is Set Out In Annex No. 8 To The Swz - Technical Documentation
|