The Following Scope Of Works Is Planned To Be Performed As Part Of The Subject Of The Order: In The Road Industry: - Preparatory Works, Including: Reconstruction Of The Route And Height Points For Linear Earthworks Approx. 0.750 Km, Dismantling Asphalt Concrete Surface Approx. 35.00 M2, Dismantling Cobblestone Sidewalks Approx. 1764.00 M2, Dismantling Markings, Cutting Down Bushes, Transplanting Tree Seedlings - Foundation, Including: Construction Of A Foundation Of Cement-Stabilized Soil, Approx. 2,479.5 M2, Construction Of An Aggregate Foundation, Approx. 2,479.5 M2 - Surfaces, Including: Concrete Paving Stones, Approx. 2,479.5 M2 (Yellow, Gray, Red), - Finishing Works, Including: Planting And Topsoiling With Sowing Of Flat Areas, Approx. 2235.00 M2, - Road Markings And Traffic Safety Devices, Including: Vertical Markings, Horizontal Markings, - Road Elements, Including: Edges, Benches, Curbs, Sewage, - Other Works, Including: Laying Protective Pipes Approx. 50.00 M, Planting Deciduous Trees And Shrubs 15 Pcs., Adjustment Of Manholes, Construction Of Manholes, Bench With Backrest 2 Pcs., Waste Bin 2 Pcs., Bicycle Repair Station 1 Pc., Planting Shrubs/Ornamental Grasses Approx. 1,143 Pcs. In The Electrical Industry, Including: Earthworks, Assembly Works (Pulling In Cables Approx. 60 M, Installation Of Led Luminaires 10 Pcs., Installation Of Sets - Sou Cabinet - 3 Pcs.), Checking Measurements. The Contractor Will Provide Surveying Services Along With Carrying Out An As-Built Surveying Inventory. A Detailed Description Of The Subject Of The Order Is The Design Documentation Together With The Supporting Bill Of Quantities And Technical Specifications For The Execution And Acceptance Of The Works, All Provisions Of The Swz Together With Questions And Answers, If Any, Were Asked During The Procedure And Were Published On The Website Where The Procedure Was Conducted.
|